[200William-EC] WILLIAM ST FACADE

CSCL cscl at optusnet.com.au
Fri Mar 22 09:44:01 EST 2013


Pls cc us all on the communication regarding this matter.  I’m very
interested to see how it proceeds George.

Thank you.

Craig Laforest

 

From: ec-bounces at 200william.com [mailto:ec-bounces at 200william.com] On Behalf
Of George Ziri
Sent: Friday, 22 March 2013 9:23 AM
To: ec at 200william.com
Subject: Re: [200William-EC] WILLIAM ST FACADE

 

Yes you are correct. I suppose I was keeping you informed.

 

I will deal with Rob on this matter.

 

 

 

________________________________________________________ 
George Ziri | Operations

 

Building Facilities Management Solutions Pty Ltd

Direct: 0400 300 242 | Facsimile: 9547 3132 | PO BOX A2319 SYDNEY SOUTH NSW
1235

 

visit us  <http://www.bfms.com.au> www.bfms.com.au

 

From: CSCL [mailto:cscl at optusnet.com.au] 
Sent: Friday, 22 March 2013 9:16 AM
To: George Ziri; ec at 200william.com
Subject: RE: [200William-EC] WILLIAM ST FACADE

 

Hi George,

Am I missing something here? Perhaps.

If the façade on William St falls under the BMC, why are we getting quotes
to have the area repaired and paid for by the owners of Marquis?  Shouldn’t
this be taken care of by Andrew Veron and his group?  Would you please
clarify why we are up for any charges. Thank you.

Regards,
Craig Laforest

 

From: ec-bounces at 200william.com [mailto:ec-bounces at 200william.com] On Behalf
Of George Ziri
Sent: Thursday, 21 March 2013 5:13 PM
To: ec at 200william.com
Subject: [200William-EC] WILLIAM ST FACADE

 

Good Afternoon All,

 

You may remember back in 2006 when the Dowling Street tiled facade was de
bonding and tile pieces dropping on the street. The Dowling st facade was
repaired and claimed under the Home Owners Warranty.  At the time the
William Street facade was also showing signs of hollowness though still fit
for purpose. Our attempt to also claim the William St facade was rejected
the facade falls under the BMC which is not covered under the HOW.  

 

Today during my inspection I discovered a approximately 15% of the tiles
extremely hollow and debonded from the surface. These can possibly fall.

 

In order to remove the tiles there are two options:

 

1.       Set up a full scaffold with hording (Council requirements) which
will cost approx 15-25k. If this method is to be carried out then:

(a)     all the tiles should be removed as it would be a short time before
the others will debond. Approx 15-25k 

(b)   once all the tiles are removed then the wall will need to be
resurfaced with either cement then painted or acrylic render which comes in
range of colours. Approx $30k 

 

2.       Remove only the affected tiles during the early hours of the
morning by ladder access. Possible risk caught by a ranger. And facade will
look unsightly until such time the facade is repaired.

 

Please note that this needs to be addressed asap.

 

 

 

________________________________________________________ 
George Ziri | Operations

 

Building Facilities Management Solutions Pty Ltd

Direct: 0400 300 242 | Facsimile: 9547 3132 | PO BOX A2319 SYDNEY SOUTH NSW
1235

 

visit us  <http://www.bfms.com.au> www.bfms.com.au

 

From: ec-bounces at 200william.com [mailto:ec-bounces at 200william.com] On Behalf
Of Matt Perkins
Sent: Thursday, 21 March 2013 1:15 PM
To: ec at 200william.com
Subject: Re: [200William-EC] Propose Foyer & Lift upgrades

 

Im a Yes to both pending final colour approval.

Matt.

 On 20/03/13 3:50 PM, Shane Ellis wrote:

Hi All, after reviewing at last nights meeting, I have a revised Quote as
per below. 

Can we get votes on each level perhaps. ie: if you could all reply, as
follows:

 

Upgrade Level E: Yes/No

Upgrade Level G: Yes/No

 

UPGRADE LEVEL E:

*Paint to purple Mosaic columns outside = $400

*Paint ceiling throughout Foyer = $1,150

*Demolish & remove purple fabric = $150

*Place arced framing, instead of existing angles at above wall = $1,250

*Place full height tiles to above at removed fabric (28m2*$80/m2) = $2,240

*Supply above high quality tiles (28m2*$80/m2) = $2,240

TOTAL LEVEL E UPGRADE = $7,430+GST = $8,173

*No allowance to replace light fittings

 

UPGRADE LEVEL G:

*Demolish and remove existing floor finishes = $1,900

*Install new floor finishes (25m2*$80/m2) = $2,000

*Supply above high quality finishes (25m2*$80/m2) = $2,000

*Remove colonial skirtings & Architraves, and square-set wall finishes =
$800

*Repaint all of Foyer = $1,800

*Less Insurance rebate (-$2,400)

TOTAL LEVEL E UPGRADE = $6,100+GST = $6,710

 

 

*Total for both Lobby areas = $15,423

 

 


Best Regards
Shane Ellis
0423 000 221

 

On 19/03/2013, at 5:29 PM, Shane Ellis <shane at ellisconstructions.com.au>
wrote:

 

Hi All,  

For discussion at Meeting, please find below indicative costs to upgrade
finishes at Lifts and at Level E+G foyers. 

Costs are fully inclusive of all material supply, design fees, etc.

I believe we should be able to tap the 'Sinking Fund' for the costs. The
existing style is very dated.

 

UPGRADE LEVEL E:

*Paint to purple Mosaic columns outside = $400

*Paint ceiling throughout Foyer = $1,150

*Demolish & remove purple fabric = $150

*Place arced framing, instead of existing angles at above wall = $1,250

*Place full height tiles to above at removed fabric (28m2*$80/m2) = $2,240

*Supply above high quality tiles (28m2*$80/m2) = $2,240

TOTAL LEVEL E UPGRADE = $7,430+GST = $8,173

 

 

UPGRADE LEVEL G:

*Demolish and remove existing floor finishes = $1,900

*Install new floor finishes (25m2*$80/m2) = $2,000

*Supply above high quality finishes (25m2*$80/m2) = $2,000

*Remove colonial skirtings & Architraves, and square-set wall finishes =
$800

*Repaint all of Foyer = $1,800

TOTAL LEVEL E UPGRADE = $8,500+GST = $9,350

*OPTION to frame Western foyer wall, add arced frame to corner, and tile
extent of wall = $4,510 Inc Tile supply & GST.

*OPTION to tile wall opposite to lift walls = $4,400

 

 

UPGRADE ELEVATORS:

*Remove 2 downlights and plug holes = $200*2 = $400

*Rub back clear finish to timber panels = $950*2 = $1,900

*Apply new stain to timber panels = $850*2 = $1,700

TOTAL ELEVATORS UPGRADE = $4,000+GST = $4,450

 

*Total for all 3 areas = $21,973

*Total including Options for Level G tiled walls = $30,883

 

These are pricing for my company to undertake the works. 

I believe that these are competitive costs, and that we will get alot of
'bang for our buck' - as we can get high quality finishes without the need
to engage an architect or designer.

 

re quality of work, below is a link to a recently completed project of mine.
http://www.brettboardman.com/FoxJohnstonArchitects_QueensParkHouse_WEB/

 

 

Best Regards
Shane Ellis
0423 000 221

 

_______________________________________________
EC mailing list
EC at 200william.com
http://200william.com/mailman/listinfo/ec

 

 

_______________________________________________
EC mailing list
EC at 200william.com
http://200william.com/mailman/listinfo/ec

 

-- 
/* Matt Perkins 
        Direct 1300 137 379     Spectrum Networks Ptd. Ltd. 
        Office 1300 133 299     matt at spectrum.com.au 
        Fax    1300 133 255     Level 6, 350 George Street Sydney 2000
        SIP 1300137379 at sip.spectrum.com.au 
        PGP/GNUPG Public Key can be found at  http://pgp.mit.edu 
*/
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://200william.com/mailman/private/ec/attachments/20130322/ec5144e4/attachment-0001.html 


More information about the EC mailing list