[200William-EC SP67851] SP67851 Marquis RE: Terrace Repair Works Apt 103
Sarkis Mouawad
smouawad at stratatitle.com.au
Thu Jan 16 13:12:54 AEDT 2020
Hi Matt,
Knowing that no one wants to hear this and looking into future expenses, I believe it Is time to start discussing the next several projects and then we can anticipate the levy.
From: ec-bounces at 200william.com <ec-bounces at 200william.com> On Behalf Of Matt Perkins
Sent: Wednesday, 15 January 2020 1:43 PM
To: Marquis <Marquis at bfms.com.au>; ec at 200william.com
Subject: Re: [200William-EC SP67851] SP67851 Marquis RE: Terrace Repair Works Apt 103
WARNING. This email was received from an external sender. You should verify the email address before processing the email.
Thanks Darren,
This is going to keep happening I think with every balcony it seems the construction of the building is substandard. Sarkis how does the budget look are we in Special Levy zone again yet.
Matt
On 15/1/20 1:35 pm, Marquis wrote:
Good morning EC,
As approved at the AGM, we engaged Distinction Waterproofing & Remedial Solutions (DWRS) to rectify leaking form the terrace of apartment 103 into their bedroom area. The plan was to remove the 1st row of tiles along the threshold of the bedroom door, remove the tile bed and membrane, detail the substrate & hop and install new membrane. Next remove the remaining terrace tiles in the walkway leading from the bedroom door to the floor drain, grind the tile bed and replace the tiles with new. The cost to undertake this work was quoted for $6,500.00 + GST. Please see the attached original works plan for reference.
DWRS started work this morning and removed terrace tiles outside the bedroom door and next to the terrace floor drain. It was found that there was inadequate tile bed to get the required fall from the bedroom door to the floor drain. To rectify, the tile bed in the area will need to be removed, the existing insulation foam would need to be replaced with a thinner version, the tile bed replaced with the correct fall to the floor drain and new tiles installed. Additional TBC cost would be incurred as a result of these findings.
Water testing of the whole Apt 103 terrace revealed that water on the western section of the area drained towards the dining room door instead of towards the floor drains. Please see the attached water testing plan for reference. Also, the parapet wall between the terrace and the eastern external building wall was significant damage where the metal corner angles have rusted and broken away the render allowing water to enter. Please see the attached photo for reference. The angles need to be ground out, replaced with new plastic or stainless steel, installation of waterproof patching over the top of the parapet wall and re-rendering.
DWRS recommend consideration should be given to repairing the parapet wall and replacing the whole terrace floor instead of the original patch repair. It will only be a matter of time before the pooling water on the western side of the terrace penetrates the dining room area and potentially into Apt G05 directly below. It would be better to use the cost of the patch repair towards the full balcony replacement as the patch repair works will need to be removed again when the western side requires repair in the future.
Apt 103 Full Terrace Floor & Parapet Wall Repairs
DWRS - $25,000.00 + GST
BIRS – 26,598.00 + GST
Please note – The terrace has a number of large free standing planter boxes which have been installed by the Lot owner. These will need to be removed at the Lot owners expense prior to the works commencing.
If you have any questions please let me know. Thanks
Kind regards,
Darren Vignes
Building Manager
[cid:image003.jpg at 01D256A7.9D3E7910]
Building Facilities Management Solutions
200 William St Woolloomooloo NSW 2011
M: 0488 388 313
Email: marquis at bfms.com.au<mailto:marquis at bfms.com.au>
www.bfms.com.au<http://www.bfms.com.au/>
Please consider the environment before printing this e-mail
The contents of this e-mail and its attachments are confidential and may be subject to legal professional privilege and copyright. It is intended solely for the addressee. Access to this e-mail and its attachment by anyone else is unauthorised. No representation is made that this e-mail or any attachment is free of viruses and other defects. Virus scanning is recommended and is the responsibility of the recipient. If you are not the intended addressee, any disclosure, usage, copying, distribution or any action taken or omitted to be taken in reliance on it, is prohibited. If you have received this communication in error, please advise the sender immediately by reply e-mail and delete this message from your computer.
_______________________________________________
EC mailing list
EC at 200william.com<mailto:EC at 200william.com>
http://200william.com/mailman/listinfo/ec
--
/* Matt Perkins
Direct 02 8916 8101 Spectrum Networks Ptd. Ltd.
Office 1300 133 299 matt at spectrum.com.au<mailto:matt at spectrum.com.au>
Level 6, 350 George Street Sydney 2000
Spectrum Networks is a member of the Communications Alliance & TIO
*/
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://200william.com/mailman/private/ec/attachments/20200116/082c4f23/attachment-0001.html
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.png
Type: image/png
Size: 25266 bytes
Desc: image001.png
Url : http://200william.com/mailman/private/ec/attachments/20200116/082c4f23/attachment-0001.png
More information about the EC
mailing list