Thanks Darren,
This is going to keep happening I think with every balcony it seems
the construction of the building is substandard. Sarkis how does the
budget look are we in Special Levy zone again yet.
Matt
On 15/1/20 1:35 pm, Marquis wrote:
>
> Good morning EC,
>
> As approved at the AGM, we engaged Distinction Waterproofing &
> Remedial Solutions (DWRS) to rectify leaking form the terrace of
> apartment 103 into their bedroom area. The plan was to remove the 1st
> row of tiles along the threshold of the bedroom door, remove the tile
> bed and membrane, detail the substrate & hop and install new membrane.
> Next remove the remaining terrace tiles in the walkway leading from
> the bedroom door to the floor drain, grind the tile bed and replace
> the tiles with new. The cost to undertake this work was quoted for
> $6,500.00 + GST. Please see the attached original works plan for
> reference.
>
> DWRS started work this morning and removed terrace tiles outside the
> bedroom door and next to the terrace floor drain. It was found that
> there was inadequate tile bed to get the required fall from the
> bedroom door to the floor drain. To rectify, the tile bed in the area
> will need to be removed, the existing insulation foam would need to be
> replaced with a thinner version, the tile bed replaced with the
> correct fall to the floor drain and new tiles installed. Additional
> TBC cost would be incurred as a result of these findings.
>
> Water testing of the whole Apt 103 terrace revealed that water on the
> western section of the area drained towards the dining room door
> instead of towards the floor drains. Please see the attached water
> testing plan for reference. Also, the parapet wall between the terrace
> and the eastern external building wall was significant damage where
> the metal corner angles have rusted and broken away the render
> allowing water to enter. Please see the attached photo for reference.
> The angles need to be ground out, replaced with new plastic or
> stainless steel, installation of waterproof patching over the top of
> the parapet wall and re-rendering.
>
> DWRS recommend consideration should be given to repairing the parapet
> wall and replacing the whole terrace floor instead of the original
> patch repair. It will only be a matter of time before the pooling
> water on the western side of the terrace penetrates the dining room
> area and potentially into Apt G05 directly below. It would be better
> to use the cost of the patch repair towards the full balcony
> replacement as the patch repair works will need to be removed again
> when the western side requires repair in the future.
>
> *Apt 103 Full Terrace Floor & Parapet Wall Repairs*
>
> DWRS - $25,000.00 + GST
>
> BIRS – 26,598.00 + GST
>
> Please note – The terrace has a number of large free standing planter
> boxes which have been installed by the Lot owner. These will need to
> be removed at the Lot owners expense prior to the works commencing.
>
> If you have any questions please let me know. Thanks
>
> Kind regards,
>
> *Darren Vignes*
>
> Building Manager
>
> *cid:image003.jpg at 01D256A7.9D3E7910*
>
> *
> Building Facilities Management Solutions*
> 200 William St Woolloomooloo NSW 2011
>
> *M: 0488 388 313
> Email: *marquis at bfms.com.au
> www.bfms.com.au <http://www.bfms.com.au/>__
>
> Please consider the environment before printing this e-mail
>
> The contents of this e-mail and its attachments are confidential and
> may be subject to legal professional privilege and copyright. It is
> intended solely for the addressee. Access to this e-mail and its
> attachment by anyone else is unauthorised. No representation is
> made that this e-mail or any attachment is free of viruses and other
> defects. Virus scanning is recommended and is the responsibility of
> the recipient. If you are not the intended addressee, any disclosure,
> usage, copying, distribution or any action taken or omitted to be
> taken in reliance on it, is prohibited. If you have received this
> communication in error, please advise the sender immediately by reply
> e-mail and delete this message from your computer.
>
>
> _______________________________________________
> EC mailing list
> EC at 200william.com
> http://200william.com/mailman/listinfo/ec
--
/* Matt Perkins
Direct 02 8916 8101 Spectrum Networks Ptd. Ltd.
Office 1300 133 299 matt at spectrum.com.au
Level 6, 350 George Street Sydney 2000
Spectrum Networks is a member of the Communications Alliance & TIO
*/
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://200william.com/mailman/private/ec/attachments/20200115/8630ae13/attachment-0001.html
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.png
Type: image/png
Size: 25266 bytes
Desc: not available
Url : http://200william.com/mailman/private/ec/attachments/20200115/8630ae13/attachment-0001.png
More information about the EC
mailing list