[200William-EC SP67851] EXT - Re: Bathroom Renovation - Unit 305 [SEC=UNOFFICIAL]

Marquis Marquis at bfms.com.au
Fri Dec 11 15:53:01 AEDT 2020


Good afternoon all,

Please see the attached report which was provided through the fit out contractors.

We arranged an inspection of both bathrooms with one of our building contractors and he agrees that the repairs will be required and has provided the attached quotation for the following scope of works:
A304 Bathroom
- Decommission bathtub to bathroom
- Remove bathtub and store for reuse
- Remove and dispose of existing wall tile and fyrchek plasterboard

A304 & A305
- Remove and dispose of water damaged fyrchek plasterboard
- Remove and replace damaged 92mm stud and track walls
- Supply and install new 16mm fyrchek (double layer) to bath wall of both units
- Supply and install new 6mm villaboard to bath walls on both sides of unit
- Apply x4 coats of sikalastic 488 membrane to bathtub walls and floor of apt 304 and complete area of bathroom apt 305
- Reinstall bathtub back to position of apt 304
- Supply and lay new wall tiles to bath wall of apt 304
- Apply polyurethane sealant along all junctions to bathtub
- Dispose of all trade waste from site
- Keep site clean
- Certificate of waterproofing on completion
Total Cost - 10,757.00 + GST
Note - Only the shower/bath area of apartment 304 will be stripped and replaced as part of this quotation. Waterproofing warranty included for both bathrooms.

The contractor who provided the initial report will be providing a quotation shortly but insists that Apt 304 requires a complete bathroom strip out if they are to provide a waterproofing warranty for both apartments. Once the quotation is received I will provide an update.

Paul Doddridge has advised that his temporary accommodation will not be available for much longer and is seeking emergency accommodation at the Strata's expense. He was informed that this must be discussed with the Strata Manager. The bathroom of Apt 304 will also be out of action for the duration of the works but the GYM bathroom could be utilised if required.

Kind regards,


Darren Vignes

Building Manager

[cid:5f19454e-cc2c-43cb-be57-f1884f5c8c44]

Building Facilities Management Solutions
200 William St Woolloomooloo NSW 2011

M: 0488 388 313
Email: marquis at bfms.com.au
www.bfms.com.au<http://www.bfms.com.au/>

 Please consider the environment before printing this e-mail

The contents of this e-mail and its attachments are confidential and may be subject to legal professional privilege and copyright. It is intended solely for the addressee. Access to this e-mail and its attachment by anyone else is unauthorised. No representation is made that this e-mail or any attachment is free of viruses and other defects. Virus scanning is recommended and is the responsibility of the recipient. If you are not the intended addressee, any disclosure, usage, copying, distribution or any action taken or omitted to be taken in reliance on it, is prohibited. If you have received this communication in error, please advise the sender immediately by reply e-mail and delete this message from your computer.

[signature_1090671040]

________________________________
From: ec-bounces at 200william.com <ec-bounces at 200william.com> on behalf of Matt Perkins <matt at spectrum.com.au>
Sent: 03 December 2020 14:02
To: ec at 200william.com <ec at 200william.com>
Subject: EXT - Re: [200William-EC SP67851] Bathroom Renovation - Unit 305 [SEC=UNOFFICIAL]


Hi Adam,

 Im away for 3 weeks leaving tonight Im sure Darren can provide a detailed report that we can discuss sounds like the budget might need to be altered prior to the AGM It's not much use me looking at it as im an not that sort of engineer.  We will likely need reports and quotes etc.

Matt



On 3/12/20 1:48 pm, Creighton, Adam wrote:
Paul, I"m really sorry to hear this, I've just cc'd the committee.
Matt seems to have the most institutional knowledge. I'm not sure if he'll be home though!
cheers,
Adam

On Thu, 3 Dec 2020 at 13:31, Doddridge, Paul MR 2 <paul.doddridge2 at defence.gov.au<mailto:paul.doddridge2 at defence.gov.au>> wrote:

UNOFFICIAL

Adam,



There has been a significant development.



Substantial rust, found behind my bathroom wall (which is a common wall with my neighbour’s bathroom) has resulted in a halt to all works pending a meeting with the body corporate.



The tracks and studs have completely rusted through and cannot be used.  They must be completely replaced which will necessitate, now that all the walls have been removed, the removal of my bathroom ceiling.  In short, a disaster, both for me, and my neighbour.  He has to do his bathroom all over again too.



A meeting has been arranged in the unit, tomorrow, 4th December 2020 between my builder, the body corporate and Darren Vignes, the building manager.  A time hasn’t been set yet because Darren is currently on leave and cannot be contacted.



I was wondering if any members of the committee would like to attend, in particular Matt Perkins (I think that’s his last name) of Unit 302.



To that end, would you mind forwarding this email to remaining members of the committee in case they would like to attend?



They can call me on any of the numbers below, tomorrow, to get a meeting time.



Cheers,



Paul Doddridge



Deskside Support Site Team Leader - Sydney

Contractor to Defence

Directorate of Regional ICT Services

SMB | ICTOD | CIOG

Department of Defence

Building 32 I HMAS KUTTABUL I NSW | 2011.

P: (02)9359 2513 |M: (0457)602 070  | E: paul.doddridge2 at defence.gov.au<mailto:paul.doddridge2 at defence.gov.au>



“High Performance, Teamwork and Respect”




--
Adam Creighton
Economics Editor
2 Holt Street Surry Hills NSW 2010
T +61 2 9288 3995 M +61 457 806 706
E creightona at theaustralian.com.au<mailto:creightona at theaustralian.com.au> W theaustralian.com.au<http://theaustralian.com.au>
Subscribe to The Australian<http://www.theaustralian.com.au/subscribe>        Follow us online   [Facebook] <http://www.facebook.com/theaustralian>  [Twitter] <https://twitter.com/australian>
[https://signature.news.com.au/5d61b69d-b0fc-4449-a50e-b09c188d476a.jpg]<http://www.theaustralian.com.au>
Proudly supporting 1 degree<http://www.1degree.net.au>, A News Corp Australia initiative.
[News Corp Australia]

This message and its attachments may contain legally privileged or confidential information. It is intended solely for the named addressee. If you are not the addressee indicated in this message or responsible for delivery of the message to the addressee, you may not copy or deliver this message or its attachments to anyone. Rather, you should permanently delete this message and its attachments and kindly notify the sender by reply e-mail. Any content of this message and its attachments which does not relate to the official business of the sending company must be taken not to have been sent or endorsed by that company or any of its related entities. No warranty is made that the e-mail or attachments are free from computer virus or other defect.


_______________________________________________
EC mailing list
EC at 200william.com<mailto:EC at 200william.com>
http://200william.com/mailman/listinfo/ec<http://200william.com/mailman/listinfo/ec>


--
/* Matt Perkins
        Direct 02 8916 8101     Spectrum Networks Ptd. Ltd.
        Office 1300 133 299     matt at spectrum.com.au<mailto:matt at spectrum.com.au>
        ABN 66 090 112 913      Level 6, 350 George Street Sydney 2000
*/
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://200william.com/mailman/private/ec/attachments/20201211/2678f6f9/attachment-0001.html 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Outlook-zgjlo4wd.png
Type: image/png
Size: 23127 bytes
Desc: Outlook-zgjlo4wd.png
Url : http://200william.com/mailman/private/ec/attachments/20201211/2678f6f9/attachment-0002.png 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Outlook-signature_.png
Type: image/png
Size: 463377 bytes
Desc: Outlook-signature_.png
Url : http://200william.com/mailman/private/ec/attachments/20201211/2678f6f9/attachment-0003.png 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 200-William-St-Woolloomooloo (1).pdf
Type: application/pdf
Size: 2574327 bytes
Desc: 200-William-St-Woolloomooloo (1).pdf
Url : http://200william.com/mailman/private/ec/attachments/20201211/2678f6f9/attachment-0002.pdf 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Q1099 Bathroom 304 & 305.pdf
Type: application/pdf
Size: 185011 bytes
Desc: Q1099 Bathroom 304 & 305.pdf
Url : http://200william.com/mailman/private/ec/attachments/20201211/2678f6f9/attachment-0003.pdf 


More information about the EC mailing list