[200William-EC SP67851] BBQ/sink on level 7 east
Craig Laforest
craigstephenlaforest at gmail.com
Wed Dec 13 01:45:23 AEDT 2017
To the Committee,
If its a vote as to whether or not the BBQ should be removed (see below), I
recommend it is demolished and that new water proofing membrane is laid
down where it stood.
In the 10 years I have lived in the building it has been used 2 times only
and even then no one cleaned it after it was used (why should our cleaner
have to do this?).
In addition, the lines are cracked and as we are spending wisely on sealing
level 7 (east side) we should take out the BBQ/sink as this could be the
one area in the future where we have water undermining the new membrane.
I vote to take the BBQ out. The cost to do this is minimal
Craig Laforest
*From:* ec-bounces at 200william.com [mailto:ec-bounces at 200william.com] *On
Behalf Of *Patrick Rush
*Sent:* Tuesday, 12 December 2017 3:02 PM
*To:* 'ec at 200william.com'
*Cc:* 'Marquis'
*Subject:* Re: [200William-EC SP67851] SP 67851 - URGENT Variations for
Approval & Update on Level 7 Rectification
*Importance:* High
Dear Committee,
After Matt and I discussed the, previously proposed option of removing the
BBQ all together late last week, Preservation Technologies, have come back
with a revised variation, which will ensure their warranty is provided for
the full waterproofing work.
To remove the BBQ and waterproof and tile the area, without reinstating the
BBQ, the cost would be $6,950.00 + GST with no other variations for such
removal and no reinstatement.
Preservation Technologies also advised they would provide a $2,500.00 + GST
credit, for not having to remove the plants and soil, which was included in
the original tender as Cathy’s gardener has organised with the assistance
of Darren,
Please see below email form Tanaz of Strat Engineering Solutions –
*Hi Patrick,*
*Prestech will provide a credit of $2,500 + GST for the removal of
remaining plants and soil to the planters to be completed by others.*
*They have requested the soil be stored on the terrace above 601 should be
confined to the far corner leaving us clear passage to the planters and
podium area, as they will still require some space for material and tool
storage. *
*The cost for demolition of the BBQ are, terminate all services, waterproof
and tile the floor area including make good and localised painting to the
wall will be $6,950 +GST.*
*Prestech have re-scheduled the project commencement to 22 January 2018;
giving the SC to approve the works to be undertaken to the BBQ area.*
*Once this has been finalised, we will work with Prestech to have a clear
scope and project sum before project commencement.*
*Regards,*
*Tanaz*
Please advise if you agree to the above variation to remove the BBQ and not
reinstate, but to tile and waterproof the area? This will require
ratification at the next General Meeting to confirm approval of the removal
of the BBQ.
If the above is agreed to Preservation Technologies have advised they will
recommence work on Monday 22nd January 2017 and will be on site until the
work is fully completed, weather permitting.
Kind regards,
*Patrick Rush*
Senior Community Manager
Phone: (02) 9266 2600 | Direct Phone: (02) 9266 2695 | Email:
prush at stratatitle.com.au <northshore at stratatitle.com.au> | Address: PO Box
2727, Taren Point, NSW 2229
[image: cid:image005.jpg at 01D369EE.1C1641F0] <http://www.stratatitle.com.au/>
--
Craig Laforest
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://200william.com/mailman/private/ec/attachments/20171213/bc2b4d7b/attachment.html
More information about the EC
mailing list