[200William-EC SP67851] SP 67851 - Level 7 Terrace Flood Testing Results for Water Ingress to Unit 601

Ed Sainsbury edsainsbury at ozemail.com.au
Wed Sep 28 17:53:34 AEST 2016


Dear EC,

I think that is a great idea to have Level 7 have a roof or some form of shelter and have it as a more usable space for all units.

The other way may be to fill in the planter boxes and have pot plants on a drip system. 

A special levy would be required to update and shelter the roof area. 

Regards,
Edward

Sent from my iPhone

> On 28 Sep 2016, at 10:08 AM, Robin Patrick <robin.j.patrick at gmail.com> wrote:
> 
> I agree with the proposal. 
> Also comfortable with obtaining quotes for roofing level 7 as per Craig's suggestion.
> 
>> On Tue, Sep 27, 2016 at 4:06 PM, Craig Laforest <cscl at optusnet.com.au> wrote:
>> To the Committee members,
>> 
>>  
>> 
>> I spoke with the engineer while he was conducting the water tests and he mentioned that we can expect expansion cracks and membrane failures at least every 6 – 7 years on level 7.
>> 
>>  
>> 
>> I recommend that we also look at a getting a quote for closing off and putting a roof over the entire eastern and western areas of level 7 including the floors, planter boxes and rotundas, instead of continually making remedial works.  In the 9 years I have lived in my apartment, this is the second time the planter boxes have failed.  This also occurred with water gaining access through the wall along the gym side of level 7 and into my bedroom second bathroom and hallway.
>> 
>>  
>> 
>> Level 7 is rarely used and I don’t believe that the one event at New Year’s eve justifies the year-long variables we face with weather.
>> 
>>  
>> 
>> I have lived in several apartments with flat roofs and we always had problems with water leakage.  A roof on an apartment building which has a flat decking area is the most successful and least prone to water penetration.
>> 
>>  
>> 
>> Craig Laforest
>> 
>>  
>> 
>> From: ec-bounces at 200william.com [mailto:ec-bounces at 200william.com] On Behalf Of Matt Perkins
>> Sent: Tuesday, 27 September 2016 2:30 PM
>> To: Patrick Rush
>> Cc: ec at 200william.com; Marquis BFMS
>> Subject: Re: [200William-EC SP67851] SP 67851 - Level 7 Terrace Flood Testing Results for Water Ingress to Unit 601
>> 
>>  
>> 
>> Thanks Patrick, 
>> 
>>  I vote that we ask the engineer to prepare the scope of work could allnothers please indicate there vote so we can go ahead and get quotes then proceed to the special levy. 
>> 
>>  
>> 
>> Matt
>> 
>>  
>> 
>>  
>> 
>>  
>> 
>> -- 
>> 
>> /* Matt Perkins
>> 
>>        Direct 1300 137 379     Spectrum Networks Ptd. Ltd.
>> 
>>        Office 1300 133 299     matt at spectrum.com.au
>> 
>>        Fax    1300 133 255     Level 6, 350 George Street Sydney 2000
>> 
>>       SIP 1300137379 at sip.spectrum.com.au
>> 
>>        Google Talk MattAPerkins at gmail.com
>> 
>>        PGP/GNUPG Public Key can be found at  http://pgp.mit.edu
>> 
>> */
>> 
>> 
>> On 27 Sep. 2016, at 1:47 pm, Patrick Rush <prush at stratatitle.com.au> wrote:
>> 
>> Dear Committee,
>> 
>>  
>> 
>> Please see attached the report from Strata Engineering Solutions detailing the issues with the water ingress from the terrace are and planter box of Level 7, which is reported as systemic across the whole property.
>> 
>>  
>> 
>> The planter box requires rectification, along with the failed membrane on the podium area and a minor repair to the balustrade post on the wall to William Street.
>> 
>> 
>> Please review the attached and confirm if you would like to proceed with specification so that tenders can be sourced?
>> 
>> 
>> Please note that the water testing on the other side, across Unit 602 is being carried out this week and should have this report within a few weeks!
>> 
>>  
>> 
>>  
>> Kind regards,
>> Patrick Rush
>> 
>> Strata Manager
>> 
>>  
>> 
>> Phone: (02) 9266 2600 | Email: prush at stratatitle.com.au | Address: PO Box 2727, Taren Point, NSW 2229
>> 
>>  
>> 
>> <image001.png>        <image002.png>    <image003.png>    <image004.png>    <image006.png>    <image008.png>
>> 
>>  
>> 
>> Emailed Communication / Documents Disclaimer
>> 
>> STM Limited takes no responsibility for content included in this email when relating to a client matter. 
>> 
>> Please view Vesture’s full email communication disclaimer on our website – www.stratatitle.com.au/disclaimer/
>> 
>> Important Notice:  Owners should be aware that all correspondence, including letters, facsimile transmissions and emails are retained on the file of your scheme and may be subject to inspection by owners and residents within your scheme, as well as prospective purchasers for any lot that may be for sale within your scheme. As such author discretion is advised.
>>  
>> 
>> <SP 67851 - Unit 601 Level 7 Terrace Flood Testing Report - 14.09.2016.pdf>
>> 
>> _______________________________________________
>> EC mailing list
>> EC at 200william.com
>> http://200william.com/mailman/listinfo/ec
>> 
>> 
>> _______________________________________________
>> EC mailing list
>> EC at 200william.com
>> http://200william.com/mailman/listinfo/ec
>> 
> 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://200william.com/mailman/private/ec/attachments/20160928/56d225fb/attachment.html 


More information about the EC mailing list