George there is no problem allowing them to do the site servey. If you
like you can direct them to me Im happy to show them around if your not
available. After they do the servery they are likely to make an offer.
There is no need to get any real involvement until the offer is made.
Then we can nail them down on stuff. In the end it's likely good for the
building. There's a lot of scare story's going around this one. The
important part here is that it's the buildings INTERNAL cabling that we
own that can not be exclusively used. The external cabling is usually in
parallel with other carriers. There are some exceptions where they
replace the external copper with fiber. (like NBN co) If they want to do
that it's a different story but we are not compelled to that either.
The only thing they can compel us to do is to allow them to run there
stuff in parallel and there is nothing wrong with that.
Matt.
On 15/05/14 4:11 PM, George Ziri wrote:
>
> Noted.
>
> No form submitted.
>
> *George Ziri*
>
> OPERATIONS
>
> *Building Facilities Management Solutions*
>
> *m:*0400 300 242
>
> *e:*georgeziri at bfms.com.au
> <mailto:georgeziri at bfms.com.au>*w:*www.bfms.com.au
> <http://u361747.sendgrid.org/wf/click?upn=paAuoSyhP986EecDgeXXTAPtCf8r8OAnKY0JBkSJh-2FCQG-2FHRXXzW3uTJ5xlck4raSNn-2B6yczCqvE9dzu0S2pJ9JvUVoehU24fTL-2FNu5fx-2FH0-2FxR71Cm0jpl-2FKvYH-2F0k4LfHrezjwhDPExfcSmWNC6JlAYdS1zG6CjJDSiUIyvxYl7XeMW3xQjvVX7llwBnuqnWabcXNrlpHITBHle9VlVrwNM22c0yog75oQwFYPjNvrG9RKMiuLv8VqbUDcdC9bzaTInVLU9m4QQ3-2BWfwquKyk-2ByDApPlj0lJjzQMTspps-2BKbdguB4w8CCg-2BEknmMn0Xs7qdKRBsoi6ri6FcyPgKvTZH9SLaaj46EYf7yhVUZYk7O87sVGWzEjubUC5umWj47Acjx6U1tQZlU7IT1xKV1xuIuTSDil3simoUOXtEof6Le07CawpkFZd31bWPC7sx5gVvrbjfI-2BbbPR9yE7xB7L-2FxhOPkd7YYwEfVo5i0T9vZAdmwuS4h0Xm6mQbaTHRi3phjgoj-2FIfdouilwBU2zJ5BDsLb-2BPXfJ25q-2Bz0WBozFxs8KY71RG5myKIgJBbTPuXGc6kLFgsg59uX9VN-2FaG36vwnCBkcl3DQUenaKgeiTr0B8h2efSWIgsc2-2FBoroF0rriJIXs4jNrWW5q4VmwdfDtiNhlk8X2kTSYPbLFiaHRFywGZPhI-2Fzh3h1ihTKLtoeWiny5xpz7kjgZQN1mYgdXtb2WXHwl1QJCuu-2FIITPIG9CD-2BRbxXtrxUHQMDxsvuBZKEmlOjCpTpdBraG3cfs3RsYyoKmu-2FLwycaV-2FIut-2BOyvq-2FMeCfeTlBvwoVqKqGKWKmarjd1fqi6Nm0E-2Fu2nu2ptMtkxI-2BwZ61ZVetCtfbVMZQpXc-2BanFKpl9xywnADfzhYozOnDTieRIvRu7XtoC2MhWKyDIdrXr4JrvzVzvfSu6Ic-2FDD56alsl5FgoMEz5XZxfZAJAyXr1Ynk4GIJ8xRF-2Ft0JED4YMGI8SmYsMNzm5wL8t0H5C3eqysn1tQiHsrJ2UCE4lWYhri-2FbJq6I-2BBZitulSi0GOptBm0mD3ZKX6HoR0uAxxCymzmr4P1gvoo0kESiVSh-2B1fPN12zcv8sYhKjOx15ZOTANiJoht1y9Cj4GUdEy4jCazQ67CMnCdvM-2B-2F7Dq55-2BsvTExhhtVLOqQ4SVi2Z8vbQ0SpHUg7l7EWqh7tRf4E4wJHBtDzSiMkVPRHmfXEbm9mpdbFNHDPzzhmEdgbkgRdLJTtffdcNhiC7U7XipY2EkrAq-2FklAvGQo6jarR0C4LTSEoOp-2FFGQ5dE-2FDnJKkvGUYPufRIMekOwm5RzkOzrBfz-2F-2Fx-2BCU-2Ft8ynR1670cUmCJ9DxKfc1VousIpAMEiMzgOJtSbwwrwWEpxUpre7MUs7LSTrGrwtrOw56TrV3N8sxBo59j5JxDA3cSKHRJYW-2FB-2BCvrlVbQ9LxTuiGb8MQEF9AwAxDWJVyr4DWD9OUATidGia-2BO-2Fu3Lk-2F0RgvpzmujxysG0CIQVCRL6sRovm6IiSDRqNkDAqRi9lQDJfivWLdHVOiX9YaJ-2F0TeZNgh9E4pc5PRIlwXv88H1rrimdKuCkElEa-2FH3c1N9F4I5VRQDXlK5tRkPDq6D934ru7Wf2ZsX-2Bwuvl-2FqSHtRNn-2FFitl0qFpuc49Py7rbgphypTrmZw7YIOrA2zT0A5Wk1ILsVGS4mV-2B-2F11TfRbD56ItRmOkpieDRDI-2Bsy2bHyFz-2BLfN1XyI2IAhjAJ6P6ZDBP9hyikFiTiyltaL4gKWR6ur5mtO3oPqONEkwQCyseXAo4bGsjGeyD0O5m9Q9pCKa-2FXmX-2Fq9V-2BsJGkmNGsRohnmIU12WbWDgrAbpKYaMrL48cCHlnQS4Osx4-2BuqltTcS3CDfIdV-2Fm6VIhz4Yjsn0lbQbEbD7IFwHrkfwCj3nYUU1j1-2Bj8i818pDSbw1E4-2Bssdyz23lCsynIIsS0cyiOxxngqbsi8mapJkAP8fC9CRbvyFs3zxwrejh4CQfe666GKiA-2BckPy378m5lK7iSwL-2FQOiTvGs-2FQMFViLIYKC-2FBJbVarq9KjwAnBXNm9J3AfYVZPoRhc6jcSoiC6mGY6sjv4fpRI2Kw7zQz0qUQRlv-2FCvVsq4RNF51ji8RrfiZMQpDjeeDIxRNCAmGtjYjgImALdEZADlU871Z1pFK6wrluocYqB6zAgxKiMGfnqDDrFkpq3MbGhCwL2XUeGu-2BTwi-2FHprrjbU-2FEOruWBWjlLexpG0jX8yCDL-2Fg24iOP3yoImvNO4-2FPPautnBejd-2BFPby4hNcDwl4mCzxOMlJAe2UvqSLl6-2Bv4JTziuP2OvUPZZBUOk-2F-2BbvMwMtKiUO7AWWrY3ObsDz9wKkKuHbp1tHwfHdxXG-2BWJnKuKZlBkT4ehqWtZUPZCWGlWri0QqKobRBdqQDHs1tgaLfpazKckMY9CLgqMe-2Bs0GnymQ9Y6YqU3BZtjRzs2mhq76iY-2FLD7wMwBEgCZeijvMNZYGfm-2BmA07ZkGU6vvxONaKIAb9f8KafQMqMkyY1Hm5qVOh2Psx2OMRU7g-2F5TBaZ9MA8IdGppidXIPlh-2FaFhFcXKWOCd-2BVerBcgOGL3KdtU-2BULJr8vAbomMf2hy-2BobEkf4DB-2BcyT8yi7TP8k1YJbm35LBVVnjGBNxnuyEui5v85WmqzwrQ7mYkvTv8RtIdMAKla2ji8faQ-2BZruhps5RBYRj7MaOwVNgK0Jsl3oSuUnEvF98pRT6Hpvve3QlvMn4wQCIylEqbfVd2h7P8T1AqM7jo3Gjijfv4YRO3WeVrFpROD2hONdcL0fx8czieUwQ-3D_L7AXvUVxwHA7qmANdxwZ9AjfPZ3XK6-2F1IMrPYxoRUWCTf4lHE1PBQ82PWm0bz2bvXEQ25YBw8kD4DoE-2BQ4WDvqoUSReRSt4ZdU2JGoQqaSQCCopkq1UTj4Pflxx-2B9Hf7IdMAtTCHFd3rvrNyY9AHFDUrD4Iw3aW27cFhJ-2FfLEwvxKYYAccq5NSZkLqgt5Rlc>
>
> cid:inlineImage1
>
> Safety | Integrity | Service | Excellence
>
> *From:*ec-bounces at 200william.com [mailto:ec-bounces at 200william.com]
> *On Behalf Of *Matt Perkins
> *Sent:* Thursday, 15 May 2014 3:47 PM
> *To:* ec at 200william.com
> *Subject:* Re: [200William-EC SP67851] FW: Access Request: 200 WILLIAM
> ST WOOLLOOMOOLOO NSW 2011
>
> Hi George and EC.
>
> Owning a telecommunications carrier myself not to mention building
> Optusnet from scratch I have a bit of knowledge here.
>
> Firstly George has a land access form been submitted. If it has There
> is no use us discussing it. There is nothing to discuss. Under the
> telecommunications act you can not refuse a licensed carrier access to
> the building for the purpose of providing telecommunications
> infastructure. We would simply spend thounds of dollars in legal fees
> for nothing. Dont get confused here dont listen to people who think
> they know. There wrong. I do this to building owners every day that's
> why we have solicitors on staff.
>
> There are things we can do.
>
> a) Ask for a fee for the space used in the basement. - We can ask Pipe
> to pay us rent for the space they are using in the MDF. it cant be
> unreasonable and will amount to perhaps $50 ~ $150 per month.
>
> b) They need to provide there own power and power meter. There DSLAM
> does not go on our house power.
>
> c) They must pass safe work method show insurance and be inducted
> onto site.
>
> d) They have no rite (exclusive or otherwise to access the internal
> building cabling) So they can put there fiber into the basement
> install there dslam but no matter what they say they can not use the
> internal cable exclusivity. If they are not providing vectored VDSL
> this is likely not what they are after in any case. Its more likely
> they just want to provide VDSL on the internal cable which co-habits
> with other services just fine. That is everyone can continue doing
> what they are doing now. Nothing will change just people in the
> building will have access to better services at cheaper prices if they
> want to do so. If not then no fowl.
>
> My suggestion is lets have a look at the agreement. Im happy to
> negotiate it. If there is no exclusive access to the internal cable
> (unlikely) and all the other boxes are ticked we should go ahead. We
> really dont have a choice.
>
>
> Matt.
>
>
>
>
>
> On 15/05/14 3:01 PM, George Ziri wrote:
>
> Good Afternoon All,
>
> TPG have asked to assess the MDF cupboard provisions so that they
> can accommodate the new fibre optic distribution. I have on three
> occasions requested a written statement that they would not have
> exclusive use on the comms pipe into the building. To date I have
> received more phones without anything in writing up to yesterday
> which still is vague. However they are happy to meet.
>
> I thought to let you know that TPG are currently at legal stages
> with another Strata Plan we manage. At this particular Strata
> Plan, TPG believe that under the telecommunications Act they are
> able to have exclusive use on the pipe into the Strata Plan. This
> therefore does not give residents or owners the option of other
> providers.
>
> It may be best that their representative meet with the building
> sub committee to discuss the matter.
>
> Please review and provide me with a response to forward to TPG
>
> *George Ziri*
>
> OPERATIONS
>
> *Building Facilities Management Solutions*
>
> *m:* 0400 300 242
>
> *e:*georgeziri at bfms.com.au <mailto:georgeziri at bfms.com.au> *w:*
> www.bfms.com.au
> <http://u361747.sendgrid.org/wf/click?upn=paAuoSyhP986EecDgeXXTAPtCf8r8OAnKY0JBkSJh-2FCQG-2FHRXXzW3uTJ5xlck4raSNn-2B6yczCqvE9dzu0S2pJ9JvUVoehU24fTL-2FNu5fx-2FH0-2FxR71Cm0jpl-2FKvYH-2F0k4LfHrezjwhDPExfcSmWNC6JlAYdS1zG6CjJDSiUIyvxYl7XeMW3xQjvVX7llwBnuqnWabcXNrlpHITBHle9VlVrwNM22c0yog75oQwFYPjNvrG9RKMiuLv8VqbUDcdC9bzaTInVLU9m4QQ3-2BWfwquKyk-2ByDApPlj0lJjzQMTspps-2BKbdguB4w8CCg-2BEknmMn0Xs7qdKRBsoi6ri6FcyPgKvTZH9SLaaj46EYf7yhVUZYk7O87sVGWzEjubUC5umWj47Acjx6U1tQZlU7IT1xKV1xuIuTSDil3simoUOXtEof6Le07CawpkFZd31bWPC7sx5gVvrbjfI-2BbbPR9yE7xB7L-2FxhOPkd7YYwEfVo5i0T9vZAdmwuS4h0Xm6mQbaTHRi3phjgoj-2FIfdouilwBU2zJ5BDsLb-2BPXfJ25q-2Bz0WBozFxs8KY71RG5myKIgJBbTPuXGc6kLFgsg59uX9VN-2FaG36vwnCBkcl3DQUenaKgeiTr0B8h2efSWIgsc2-2FBoroF0rriJIXs4jNrWW5q4VmwdfDtiNhlk8X2kTSYPbLFiaHRFywGZPhI-2Fzh3h1ihTKLtoeWiny5xpz7kjgZQN1mYgdXtb2WXHwl1QJCuu-2FIITPIG9CD-2BRbxXtrxUHQMDxsvuBZKEmlOjCpTpdBraG3cfs3RsYyoKmu-2FLwycaV-2FIut-2BOyvq-2FMeCfeTlBvwoVqKqGKWKmarjd1fqi6Nm0E-2Fu2nu2ptMtkxI-2BwZ61ZVetCtfbVMZQpXc-2BanFKpl9xywnADfzhYozOnDTieRIvRu7XtoC2MhWKyDIdrXr4JrvzVzvfSu6Ic-2FDD56alsl5FgoMEz5XZxfZAJAyXr1Ynk4GIJ8xRF-2Ft0JED4YMGI8SmYsMNzm5wL8t0H5C3eqysn1tQiHsrJ2UCE4lWYhri-2FbJq6I-2BBZitulSi0GOptBm0mD3ZKX6HoR0uAxxCymzmr4P1gvoo0kESiVSh-2B1fPN12zcv8sYhKjOx15ZOTANiJoht1y9Cj4GUdEy4jCazQ67CMnCdvM-2B-2F7Dq55-2BsvTExhhtVLOqQ4SVi2Z8vbQ0SpHUg7l7EWqh7tRf4E4wJHBtDzSiMkVPRHmfXEbm9mpdbFNHDPzzhmEdgbkgRdLJTtffdcNhiC7U7XipY2EkrAq-2FklAvGQo6jarR0C4LTSEoOp-2FFGQ5dEwiMlpTwBuesFQlE0crc5hGxvWSfiOTjqgGIHxLexeKZEJ8hgTAAjaX9f336alFX7UD18BwjglNfgVB39qzuYDnXiCNqoLFxrPhg8xwW2xIa9AYYgVmsbn4W5-2BQwIOackcui9jDSVCQj0HrJeucuOp1NXZKF2yNyH47eaP7VSzGx7yEaDOucShN76RSS7gMZRgp9gAuAhcLHv-2FFvtTgdjxdevMLgvXzpfQiTNWk2ilmCODSVExH8TyHskukOdlLHjavIaK75D9p46Erxcu3EVXS-2BD39-2FrWHoPhETMEaN3DKEdxMU2oMP3BXuNqn5m9Nxll-2BxpHvy690Ei331YcaRNmZ2ffVi5yVsZ73VVb513W8eTuK-2FdawowStyqyOQK3vVd81xxde0IGcEiOD-2BCtdYBXIzOQlUtaJjpuQQAugsRRXpORYN9Ebf4siFoefzU-2FQxkxQzyfShdc5EyURqWW51D6lHLFXz7nSe6-2BPUpHVtCyFwvqrPXSSilMMUN-2FKoCmWlcOyK24Yvj8gEIz63L8sYoPZddzbQEfNyEHrHBZEcNxuv6tBb6U1iPqD8kZ-2FQg2neZvWLhxLkL8uhvGp7cqohYqSxqAAaeyUx5eWUS4v7UF8oAfZPWKJiJXB8v7D2r45Xiqav5S1UDFfS4YEY1VJW-2B6PLYG9MDDqTIK4rzfeUSjEpIqKeTeE5ITErRujdEsGVv4rQCFNXCHmmKdEJ6LSo-2FM-2F2s39IgkpT-2FAi2DdZMH3uHxi-2FnD10MZJ8pzJjAH516-2BJRKlAPhHM8XyV2Wi4RSX0O8-2FekwFxWdk9PyF1-2F-2BL4Y-2FvuZuFD82lhbh7VMMw0lffdk2g3ZzN-2B8ehv-2Fkfb6MwVLFATvUFYqAgVNEH6hMaq9avu7DwfrLnPP53C2i1PrVkT0hciBBmoqh3V44eWpAjORNmRrA6al0-2Bko-2F1OTcQePcmUKaROttwTg0SVPgr4WavP-2FFJImNgoiOfCJ2eNOz6tkaF-2F-2BvT0-2F17JmEWtmXVB99xzS6g-2Baeg4HxnMbAdyQxAWE3UEHpHtUI2x6J-2Fge0xISAWmxFXXekBRe9F3sLG7gxLICZNFSzC4gCPkL3t0owg2Vkys9Yn714O0-2B5qDjJxW1TPJsYDjwKXW-2FlVxVnpTVQBwToO-2FFFKc9Ovwogqouegiksp1t3UenZOINfST8OVNFhSV8L-2Bxfcp-2FVzlNXCTKPcLI9WLxN-2B-2Fjn3-2ByPjYszXJh4WraCbHdwRpEf8JYKAIWylMKdTmsf4Fgis0vEnu5dA9-2FoMSw4jcF1sTjVLKsFUUC9Qj5kteg6yWA0-2BM8cO1wpZOr9y-2FRdJEk397NxkPvRd62Gp1RCjoQ69FuHvK-2Boi9A0HPe1h4NIAkBiMDNR-2F31bOpnu5zjwSxtvlcmfIJldJlsNv0RGZfyvtLeKadH6GoPoQ9TeZee8cXPzLwlR0JINta98IaoyUDnZXCh5LuGp-2BeeTz-2FemoO5nqCIsC54rFJRShzhBMVyQTCPQTmz1uBQQ-3D_L7AXvUVxwHA7qmANdxwZ9AjfPZ3XK6-2F1IMrPYxoRUWCTf4lHE1PBQ82PWm0bz2bvrovIYdoXDxQNSDC7uZszDgXTCGGI33YEEqnKMOBjowPVa7aGPq2nGomxVcRTDhayqWb0OLj5ggJK9NhXVREb-2FssJZc4bK-2FSfvfy7Q18j5t-2FXUYGzD-2FUd1uCsTjARGjnz>
>
> cid:inlineImage1
>
> Safety | Integrity | Service | Excellence
>
> *From:*James Ho [mailto:James.Ho at pipenetworks.com]
> *Sent:* Wednesday, 14 May 2014 5:30 PM
> *To:* George Ziri
> *Cc:* admin_officer at tpg.com.au <mailto:admin_officer at tpg.com.au>;
> Say Deseo; Bob Ngariki; Craig Gudgeon; Danny Le; Paul Cini; Celina
> Chua; Timothy Strachan
> *Subject:* RE: Access Request: 200 WILLIAM ST WOOLLOOMOOLOO NSW 2011
> *Importance:* High
>
> Hi George,
>
> I would like to extend my appreciation towards your speedy
> response on the phone on this manner.
>
> PIPE is happy to send our *company representative *to any of the
> EC meetings to address:
>
> §Construction, building-related queries
>
> §Explain our legal rights as per the /Schedule 3 of the
> Telecommunications Act 1997 (Cth)/
>
> §Provide additional perspective on our FTTB proposal.
>
> *Timothy Strachan (Company Representative):*
>
> *T +61 2 8220 6071 *
>
> *M +61 402 333 456*
>
> PIPE has significant experience building fibre optic networks for
> commercial clients in both the private & public sector *since
> 2002*. Attached in this email is a Corporate Profile outlining our
> significant experience & capabilities in the industry.
>
> Following the recent acquisition of AAPT, the incorporation of
> AAPT's inter-capital fibre into TPG's extensive CBD, metropolitan
> and international network assets has provided us with an
> incredibly diverse & powerful network capable of delivering
> significant value to our customers. /(a combined total of
> *14,000km *of fibre optic cabling post AAPT)./
>
> **
>
> *_Additional info about installation:_*
>
> **
>
> **
>
> Additional Info.png
>
> Also, if you would be so kind to forward this informative response
> to the EC members.
>
> We look forward to establishing a meeting date with the EC from
> your side (sometime around early June, perhaps?). To assist us in
> addressing any potential technical issues beforehand, a quick site
> survey would be helpful or photos of the MDF room from your side,
> to identify if the building is unfit for installation works.
>
> Have a great week ahead & Thank you for your time.
>
> T : 02 8916 3222
>
> Email : james.ho at pipenetworks.com <mailto:james.ho at pipenetworks.com>
>
> James Ho
> Project Officer
> PIPE Networks Pty Limited - A TPG Telecom Limited Company (ASX: TPM)
>
> Fibre Operations & Provisioning Group is Quality endorsed by the
> ISO 9001:2008 certification
>
> Web: www.pipenetworks.com
> <http://u361747.sendgrid.org/wf/click?upn=paAuoSyhP986EecDgeXXTAPtCf8r8OAnKY0JBkSJh-2FCQG-2FHRXXzW3uTJ5xlck4raQdFbX68Wv4j0MXMVmYs-2FK21bE-2B1YOwPeIEgyfImv9fOE1wb6pPQc5ZEphBCWveIVRGFqINiY7uwGC-2FPpSCUstRyjkZa4uw4-2F503KlVow1KtgTiHi-2FDkU-2FZqgfAKMSaPVH7CA1RUDqvDMQsRMeGucRoNT-2F8ELlFVYHpdoxNk4mfGKH-2Bnx2u3P8USQK-2Fl2mHJB5V5umjpezREHuJln4oBqt4Zki1VvE3HFxH8VpSivem2pskcHe2m1rftnXAlJX-2FliwIqKpf-2FBWbvXQ8Mx0H9YWjMds-2FjjuksAmF3kBeJ3UcFR5XhQfLOV70OvPph-2Bng2bCG1cO8-2FskeBb8Qro92lQ9d-2FeTqt60B03hun4MB9Z4cg-3D_L7AXvUVxwHA7qmANdxwZ9AjfPZ3XK6-2F1IMrPYxoRUWCTf4lHE1PBQ82PWm0bz2bvmg-2BWfOGR7VcSPnbjqFkAPR7H9zrqjfcF7Ik8VXpQzOUMfXkLaYPJwLCtT2mwaVFkn6TWCiUz4RIhrh81CIpV7HPHkO5bJ7-2B25i15LiywdpXRHYSf26TLC5cSHIBZE6Cp>
>
> *From:*James Ho
> *Sent:* Friday, 2 May 2014 12:33 PM
> *To:* 'georgeziri at bfms.com.au <mailto:georgeziri at bfms.com.au>'
> *Cc:* admin_officer at tpg.com.au <mailto:admin_officer at tpg.com.au>;
> 'Say Deseo'; Bob Ngariki; Craig Gudgeon; Danny Le; Paul Cini;
> 'Celina Chua'
> *Subject:* RE: Access Request: 200 WILLIAM ST WOOLLOOMOOLOO NSW 2011
> *Importance:* High
>
> Hi George,
>
> A very good day to you. My name is James Ho & I am a colleague of
> Joy operating in the PIPE fibre infrastructure team. We would like
> to thank you for your speedy responses below.
>
> Your query was:"how many telcom providers including TPG will be
> able to use the pipe equipment coming into the building?"
>
> ·*Primary User --TPG Subscribers*
>
> This equipment is installed on behalf of TPG, therefore the
> primary telecom provider using this equipment will be TPG & the
> beneficiaries being TPG subscribers. Non-TPG subscribers can
> benefit from the FTTB infrastructure if they wish to upgrade &
> switch over to TPG as their service provider.
>
> ·*Other Carriers*
>
> Our chairman has announced that "wholesale access" will be open to
> other carriers, upon commercial arrangements between carriers.
>
> We are looking to perform a *quick /site survey/*// (around 30
> mins) on the building to determine the *location of the
> telecommunication equipment* & also as a */feasibility study/*. As
> the equipment used in this exercise is very expensive, we wish to
> ensure that any installation activity carried out for the benefit
> of our subscribers (>6 in this building) can be effected in an
> */economic manner/*. Inherent building structural
> issues/unsolvable duct problems could potentially invalidate the
> exercise.
>
> We wish not to waste the *ECs time on a proposal* that is not
> feasible, nor spend a large capital expenditure on hauling fibre
> from the road only to find that the installation cannot be
> performed. Also a site survey will help us to determine how best
> to optimize the installation process for *maximum equipment
> functionality*.
>
> Perhaps we could get in touch sometime today or tomorrow for a
> quick discussion. We believe the site survey/feasibility study
> will save both parties time & resources moving forward. Our
> proposed site survey date for this building is *9am,* *next week
> Friday, 9^th May 2014.*
>
> Thank you & have a great day.
>
> T : 02 8916 3222
>
> Email : james.ho at pipenetworks.com <mailto:james.ho at pipenetworks.com>
>
> *From:*Say Deseo [mailto:say.deseo at tpg.com.au]
> *Sent:* Wednesday, 30 April 2014 9:59 AM
> *To:* Bob Ngariki
> *Cc:* James Ho; admin_officer at tpg.com.au
> <mailto:admin_officer at tpg.com.au>
> *Subject:* FW: Access Request: 200 WILLIAM ST WOOLLOOMOOLOO NSW 2011
>
> Hi Bob,
>
> Requesting assistance please. Kindly check queries below.
>
> Thank you.
>
> Best Regards,
>
> *Say Deseo - Project Admin Officer **
> *Fibre Operations Team
> PIPE Networks Pty Limited - A TPG Telecom Company
>
> Fibre Operations & Provisioning Group is Quality endorsed by the
> ISO 9001:2008 certification
>
> Phone: +61 02 90079935 Ext 5463
> Web: www.pipenetworks.com <blocked::http://www.pipenetworks.com/>
>
> Any information transmitted in this message and its attachments is
> intended only for the person or entity to which it is addressed. The
> above email correspondence should be read in conjunction with our
> standard disclaimer/terms which can be found at
> www.pipenetworks.com/docs/disclaimer.htm
> <http://u361747.sendgrid.org/wf/click?upn=paAuoSyhP986EecDgeXXTAPtCf8r8OAnKY0JBkSJh-2FCQG-2FHRXXzW3uTJ5xlck4raQdFbX68Wv4j0MXMVmYs-2FK21bE-2B1YOwPeIEgyfImv9fOE1wb6pPQc5ZEphBCWveIVa6xzCWy-2BMNrzdwF36017DuMKhvGvfmE1-2FWRj-2FBRM9dPcqmTsnRSXs4FRNtVV-2FSFs8VTyWcmkXKXBh6s4P4XMaNbh3B2UTtYsx8jt9DzerWCJk-2FeA-2F3MYGwLWZbwr-2BP5LtbpksEGfayhyzJxnqF4t2-2Fa3SYcquU4Z7hqDHPxRVlcja1Rt2sntKL7U7mLenRHwpoYlWLWsPGiiX6Zg4bzSss9eT5p8KUooFB5Nj5eRwRA9oYHIGenoQ7xPwduDxU6jnKTyWyHnmbZ8r8p7cZJ-2Fx743Vsr8ZpEFKsjRnaoDhXtjKHWWWkZEuB9K6xhxE8FmGzXlzLErZefsk6FXJfUChg-3D-3D_L7AXvUVxwHA7qmANdxwZ9AjfPZ3XK6-2F1IMrPYxoRUWCTf4lHE1PBQ82PWm0bz2bvk-2B-2BrpR4w4iJtkMK8bsFwJ-2BqWeyiQyfIaYya3eF6Fhq3duJCdp6HNM0wJkR3IWlRfmAmVaoiO4BqoevdX3P2ho-2FuAz50GltuX28-2F8lzxlMsWyuaLr6QKJ5RJwgUEiNMMP>
>
> ------------------------------------------------------------------------
>
> *From:*George Ziri [mailto:Georgeziri at bfms.com.au]
> *Sent:* Tuesday, 29 April 2014 7:03 PM
> *To:* Say Deseo
> *Subject:* RE: Access Request: 200 WILLIAM ST WOOLLOOMOOLOO NSW 2011
>
> Say
>
> Would you please advise on how many telcom providers including TPG
> will be able to use the pipe equipment coming in the building?
>
> *George Ziri*
>
> OPERATIONS
>
> *Building Facilities Management Solutions*
>
> *m:* 0400 300 242
>
> *e:*georgeziri at bfms.com.au <mailto:georgeziri at bfms.com.au> *w:*
> www.bfms.com.au
> <http://u361747.sendgrid.org/wf/click?upn=paAuoSyhP986EecDgeXXTAPtCf8r8OAnKY0JBkSJh-2FCQG-2FHRXXzW3uTJ5xlck4raSNn-2B6yczCqvE9dzu0S2pJ9JvUVoehU24fTL-2FNu5fx-2FH0-2FxR71Cm0jpl-2FKvYH-2F0k4LfHrezjwhDPExfcSmWNC6JlAYdS1zG6CjJDSiUIyvxYl7XeMW3xQjvVX7llwBnuqnWabcXNrlpHITBHle9VlVrwNM22c0yog75oQwFYPjNvrG9RKMiuLv8VqbUDcdC9bzaTInVLU9m4QQ3-2BWfwquKyk-2ByDApPlj0lJjzQMTspps-2BKbdguB4w8CCg-2BEknmMn0Xs7qdKRBsoi6ri6FcyPgKvTZH9SLaaj46EYf7yhVUZYk7O87sVGWzEjubUC5umWj47Acjx6U1tQZlU7IT1xKV1xuIuTSDil3simoUOXtEof6Le07CawpkFZd31bWPC7sx5gVvrbjfI-2BbbPR9yE7xB7L-2FxhOPkd7YYwEfVo5i0T9vZAdmwuS4h0Xm6mQbaTHRi3phjgoj-2FIfdouilwBU2zJ5BDsLb-2BPXfJ25q-2Bz0WBozFxs8KY71RG5myKIgJBbTPuXGc6kLFgsg59uX9VN-2FaG36vwnCBkcl3DQUenaKgeiTr0B8h2efSWIgsc2-2FBoroF0rriJIXs4jNrWW5q4VmwdfDtiNhlk8X2kTSYPbLFiaHRFywGZPhI-2Fzh3h1ihTKLtoeWiny5xpz7kjgZQN1mYgdXtb2WXHwl1QJCuu-2FIITPIG9CD-2BRbxXtrxUHQMDxsvuBZKEmlOjCpTpdBraG3cfs3RsYyoKmu-2FLwycaV-2FIut-2BOyvq-2FMeCfeTlBvwoVqKqGKWKmarjd1fqi6Nm0E-2Fu2nu2ptMtkxI-2BwZ61ZVetCtfbVMZQpXc-2BanFKpl9xywnADfzhYozOnDTieRIvRu7XtoC2MhWKyDIdrXr4JrvzVzvfSu6Ic-2FDD56alsl5FgoMEz5XZxfZAJAyXr1Ynk4GIJ8xRF-2Ft0JED4YMGI8SmYsMNzm5wL8t0H5C3eqysn1tQiHsrJ2UCE4lWYhri-2FbJq6I-2BBZitulSi0GOptBm0mD3ZKX6HoR0uAxxCymzmr4P1gvoo0kESiVSh-2B1fPN12zcv8sYhKjOx15ZOTANiJoht1y9Cj4GUdEy4jCazQ67CMnCdvM-2B-2F7Dq55-2BsvTExhhtVLOqQ4SVi2Z8vbQ0SpHUg7l7EWqh7tRf4E4wJHBtDzSiMkVPRHmfXEbm9mpdbFNHDPzzhmEdgbkgRdLJTtffdcNhiC7U7XipY2EkrAq-2FklAvGQo6jarR0C4LTSEoOp-2FFGQ5dEwiMlpTwBuesFQlE0crc5hGxvWSfiOTjqgGIHxLexeKZEJ8hgTAAjaX9f336alFX7UD18BwjglNfgVB39qzuYDnXiCNqoLFxrPhg8xwW2xIa9AYYgVmsbn4W5-2BQwIOackcui9jDSVCQj0HrJeucuOp1NXZKF2yNyH47eaP7VSzGx7yEaDOucShN76RSS7gMZRgp9gAuAhcLHv-2FFvtTgdjxdevMLgvXzpfQiTNWk2ilmCODSVExH8TyHskukOdlLHjavIaK75D9p46Erxcu3EVXS-2BD39-2FrWHoPhETMEaN3DKEdxMU2oMP3BXuNqn5m9Nxll-2BxpHvy690Ei331YcaRNmZ2ffVi5yVsZ73VVb513W8eTuK-2FdawowStyqyOQK3vVd81xxde0IGcEiOD-2BCtdYBXIzOQlUtaJjpuQQAugsRRXpORYN9Ebf4siFoefzU-2FQxkxQzyfShdc5EyURqWW51D6lHLFXz7nSe6-2BPUpHVtCyFwvqrPXSSilMMUN-2FKoCmWlcOyK24Yvj8gEIz63L8sYoPZddzbQEfNyEHrHBZEcNxuv6tBb6U1iPqD8kZ-2FQg2neZvWLhxLkL8uhvGp7cqohYqSxqAAaeyUx5eWUS4v7UF8oAfZPWKJiJXB8v7D2r45Xiqav5S1UDFfS4YEY1VJW-2B6PLYG9MDDqTIK4rzfeUSjEpIqKeTeE5ITErRujdEsGVv4rQCFNXCHmmKdEJ6LSo-2FM-2F2s39IgkpT-2FAi2DdZMH3uHxi-2FnD10MZJ8pzJjAH516-2BJRKlAPhHM8XyV2Wi4RSX0O8-2FekwFxWdk9PyF1-2F-2BL4Y-2FvuZuFD82lhbh7VMMw0lffdk2g3ZzN-2B8ehv-2Fkfb6MwVLFATvUFYqAgVNEH6hMaq9avu7DwfrLnPP53C2i1PrVkT0hciBBmoqh3V44eWpAjORNmRrA6al0-2Bko-2F1OTcQePcmUKaROttwTg0SVPgr4WavP-2FFJImNgoiOfCJ2eNOz6tkaF-2F-2BvT0-2F17JmEWtmXVB99xzS6g-2Baeg4HxnMbAdyQxAWE3UEHpHtUI2x6J-2Fge0xISAWmxFXXekBRe9F3sLG7gxLICZNFSzC4gCPkL3t0owg2Vkys9Yn714O0-2B5qDjJxW1TPJsYDjwKXW-2FlVxVnpTVQBwToO-2FFFKc9Ovwogqouegiksp1t3UenZOINfST8OVNFhSV8L-2Bxfcp-2FVzlNXCTKPcLI9WLxN-2B-2Fjn3-2ByPjYszXJh4WraCbHdwRpEf8JYKAIWylMKdTmsf4Fgis0vEnu5dA9-2FoMSw4jcF1sTjVLKsFUUC9Qj5kteg6yWA0-2BM8cO1wpZOr9y-2FRdJEk397NxkPvRd62Gp1RCjoQ69FuHvK-2Boi9A0HPe1h4NIAkBiMDNR-2F31bOpnu5zjwSxtvlcmfIJldJlsNv0RGZfyvtLeKadH6GoPoQ9TeZee8cXPzLwlR0JINta98IaoyUDnZXCh5LuGp-2BeeTz-2FemoO5nqCIsC54rFJRShzhBMVyQTCPQTmz1uBQQ-3D_L7AXvUVxwHA7qmANdxwZ9AjfPZ3XK6-2F1IMrPYxoRUWCTf4lHE1PBQ82PWm0bz2bvWBhKk9IHTZ-2F7Sv4ewSq1n31gait1yJnssRb70r57LG8-2B7jc5JgrgAlnu6MgRwJOkNJvvInae8MTIW5qO9L383ucDKdhBavG-2Fjg1FGo2WYasKn2pKpZ-2FyoAVh3FC7CKtK>
>
> cid:inlineImage1
>
> Safety | Integrity | Service | Excellence
>
> *From:*Say Deseo [mailto:say.deseo at tpg.com.au]
> *Sent:* Tuesday, 29 April 2014 1:20 PM
> *To:* George Ziri
> *Cc:* admin_officer at tpg.com.au <mailto:admin_officer at tpg.com.au>;
> 'pipe'; 'guy graham'; 'Grace Edwards'; 'Bob Ngariki'
> *Subject:* Access Request: 200 WILLIAM ST WOOLLOOMOOLOO NSW 2011
>
> Dear George,
>
> **
>
> *_Introduction_*
>
> In conjunction with our exercise of *upgrading & maintaining*
> communication equipment across Woolloomooloo, PIPE Networks have
> been assigned to install new fibre optic infrastructure on behalf
> of TPG.
>
> TPG is a telecommunication service provider and plans to
> upgradeexisting TPG customers within your building to high-speed
> fibre optic broadband at *no cost*.
>
> *_Purpose_*
>
> Following this, a quick site visit is required *to determine how*
> PIPE Networks will connect a new PIPE fibre cable into new PIPE
> equipment within the building main MDF room.
>
> We would like to formally make an appointment as per the details
> below:
>
> *Where:**200 WILLIAM ST WOOLLOOMOOLOO NSW 2011*
>
> **
>
> **
>
> *Areas:***
>
> *Building MDF Room*
>
> *Building Lead-in*(where telecommunication cables enter the
> building through the street)
>
> *Cable Tray Route *from lead-in entry to the MDF Room
>
> *_Additional information about the installation _*
>
> * *No cost to the customer*(Fully funded by PIPE)
> * *Improvement on service*fault recovery lead times.
> * *Improved speeds*as customers are migrated from traditional
> copper to a fibre network.
> * *No interruption*or impact to any other carrier services.
> * *PIPE has rights *under the /Telecommunications Act 1997(Act)/
> to inspect land & install a low-impact facility.
>
> *_Follow-up after site visit_*
>
> All diagrams and plans detailing the proposed installation
> works,will be submitted to you upon completion of the site survey
> via a LAAN (Land Access & Activity Notice) document, as per
> requirement of /Schedule 3 of Telecommunications Act./
>
> *_For your action_*
>
> Following your email response, our contractor will contact you
> directly and arrange *a suitable time & date* for the site visit.
>
> We seek to ensure that the site survey will be carried out by our
> contractors in a diligent manner with proper scale photos and
> drawings.
>
> We appreciate your time and support on this matter.Thank you &
> have a great day ahead.
>
> Best Regards,
>
> *Say Deseo - Project Admin Officer **
> *Fibre Operations Team
> PIPE Networks Pty Limited - A TPG Telecom Company
>
> Fibre Operations & Provisioning Group is Quality endorsed by the
> ISO 9001:2008 certification
>
> Phone: +61 02 90079935 Ext 5463
> Web: www.pipenetworks.com <blocked::http://www.pipenetworks.com/>
>
> Any information transmitted in this message and its attachments is
> intended only for the person or entity to which it is addressed. The
> above email correspondence should be read in conjunction with our
> standard disclaimer/terms which can be found at
> www.pipenetworks.com/docs/disclaimer.htm
> <http://u361747.sendgrid.org/wf/click?upn=paAuoSyhP986EecDgeXXTAPtCf8r8OAnKY0JBkSJh-2FCQG-2FHRXXzW3uTJ5xlck4raSNn-2B6yczCqvE9dzu0S2pJ9JvUVoehU24fTL-2FNu5fx-2FH0-2FxR71Cm0jpl-2FKvYH-2F0k4LfHrezjwhDPExfcSmWNC6OcOfmKEQa80ths3FoqJxhDB2Ubfac86UiHOj-2BKL-2BFvZN2EoG6nq8pShGCR8yF1d9aDDZlV3LhjyipAghzpzMdTNaFbR8GvFkTUkJ3pP6rc-2BHFWeH6iC5bBM4pmytj8dK1B0QeCUierY7SqAB6dqa6EmFcqBDtUY4qrae5uILpK89l3HMLbD8S1u264rPqlS3xJu6ib02Rma7ApGhWeHsTbXYGh8XjkPMdHHXSA7lDEf5mkqcFbtI7o4-2Fk0VmfdxE9WpAqgnC1ETs5U3kWUgLhFVe5Xt5Prxcxppam9CUF7Tjs4VqK00-2B6VIwRjHXpuX2Zw9haXh-2FJIvY0reGim087-2B7hamAvmH-2FDAytOLLs2jBxgQrtDDZ3ylrKCXKOgC23roMIXZWntuAwZtcztijxWQI5v8iiMT-2BuLOgrYbvNXoPUwIWiyAqR1Ti2fHhWUUdG0CU7j70xDq9a7I2WyKLhQvrFkaacnMjrkg3Bx0zfwM0F3DBvUhBKSJLUsMVE8xRSehlg-2BlanwoJvQdPVekwFcbld2noI1H9LpqfBCNE8-2B-2Fvll1dkLoSzUXsDCapBsW5j2G6PwZT0Rz1qzatMzLg6B0uMwOAtieCJualDe40gyaEmmVA0VCRH9NNBf7AYCgXj0GA4Y8ZQWSHC1BswHTISl-2BfpU-2FUBqZxbFnhg3snHkuKyT0boiCcyvgoJyOScHQez-2FlxQFoq9L9AN9mQjgjTh-2BGY0RqZNSvpTpZphNx77iqY-2F0mybrj9G3QnuUM40T-2FDzRqxMTZLeKyQ7wViMqX9XaomyeipIx5EgEZgie17cu1-2BiaepOyvFHbYA-2FOZvAd-2FPZLSpZXHqGDQQfdF7CNkCinot8ZVmHPNRzHW7Gg5JsWzaySLq3gu6uYfjCRuUops9QPqqRfOW7xnzLGQy5PGBDfLTkrz-2FusbYONkFjugYwVv6ZCm4-2BPBKJErPC3e2f2UsTKQ-3D-3D_L7AXvUVxwHA7qmANdxwZ9AjfPZ3XK6-2F1IMrPYxoRUWCTf4lHE1PBQ82PWm0bz2bvKJ4jDv8GSeVCIo1qtYqM2rey1HGPtJ7tlF-2FAGZnD04rJhV-2BUrIqpH3Nbe7du-2F0mZy8vBna9LBqxOfW7aKo4XlgIIDZzpm3Cwcgcm0C-2FyE1Q8OaqX514Zdip65618TY4y>
>
>
>
>
> _______________________________________________
>
> EC mailing list
>
> EC at 200william.com <mailto:EC at 200william.com>
>
> http://200william.com/mailman/listinfo/ec <http://u361747.sendgrid.org/wf/click?upn=HlAArIa521ZqKPtuGON6G8vfSrjYFptYcc177gHg5FbQDdPXww1-2B7yt-2Fyv0pTgcj_L7AXvUVxwHA7qmANdxwZ9AjfPZ3XK6-2F1IMrPYxoRUWCTf4lHE1PBQ82PWm0bz2bvsCMe-2F9bCOkT82ojo5ejourvTsj-2F0CvcsK5uWQFr-2FM7tHiE3fGqfq8ye1d-2B2oO4pjUnrqYAME2Vo9wzzEGxagRMxwiojLEkc15SyodHTj-2FzQFKvlMmAAIdESwVUmLXjcj>
>
>
>
>
> --
> /* Matt Perkins
> Direct 1300 137 379 Spectrum Networks Ptd. Ltd.
> Office 1300 133 299matt at spectrum.com.au <mailto:matt at spectrum.com.au>
> Fax 1300 133 255 Level 6, 350 George Street Sydney 2000
> SIP1300137379 at sip.spectrum.com.au <mailto:1300137379 at sip.spectrum.com.au>
> PGP/GNUPG Public Key can be found athttp://pgp.mit.edu <http://u361747.sendgrid.org/wf/click?upn=jTv0FP7eisBEFuRmWGumnsAAmscuJMHLTg4TC7v8vv0-3D_L7AXvUVxwHA7qmANdxwZ9AjfPZ3XK6-2F1IMrPYxoRUWCTf4lHE1PBQ82PWm0bz2bvRsdLzOyQPkTYZdHmg5KcTKMcjjxVpoHz88BRAu01SqXTsJd803NOMnAIl6LNGM-2Bn69W9pM-2Bh-2BRuczGp-2Ben4fUfyn9qsErUAKIVJfVUS-2BxQY7TMv5mL47xvmdO-2BSz8-2FeC>
> */
--
/* Matt Perkins
Direct 1300 137 379 Spectrum Networks Ptd. Ltd.
Office 1300 133 299 matt at spectrum.com.au
Fax 1300 133 255 Level 6, 350 George Street Sydney 2000
SIP 1300137379 at sip.spectrum.com.au
PGP/GNUPG Public Key can be found at http://pgp.mit.edu
*/
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://200william.com/mailman/private/ec/attachments/20140515/912f8971/attachment-0001.html
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/gif
Size: 5202 bytes
Desc: not available
Url : http://200william.com/mailman/private/ec/attachments/20140515/912f8971/attachment-0001.gif
More information about the EC
mailing list