[200William-EC] Propose Foyer & Lift upgrades
CSCL
cscl at optusnet.com.au
Thu Mar 21 14:15:32 EST 2013
Hi all,
I agree to Shane's proposal of modernising the level E foyer, but not level
G. Level G is not a primary 'show-case' foyer and I believe we should
simply maintain it in its present form/style and only replace the carpet
(which is already covered by insurance following the recent water damage).
I believe it paramount that we maintain adequate monies in the Sinking fund
for future projects. We have struggled doing this in the past. During our
meeting on Tuesday, George mentioned the flooring in the outside plant area
needs to be replaced very soon and we also need to plan for new carpet on
each floor level 1 through 5.
I agree with the idea of developing a sub-committee to determine the
colour/type of stonework/tile for level E and am happy to offer my services.
Thanks to Shane for taking the initiative to provide quotations to bring our
lobby/lobbies into the 21st Century!
Regards,
Craig Laforest
From: ec-bounces at 200william.com [mailto:ec-bounces at 200william.com] On Behalf
Of Shane Ellis
Sent: Wednesday, 20 March 2013 3:50 PM
To: ec at 200william.com
Subject: Re: [200William-EC] Propose Foyer & Lift upgrades
Hi All, after reviewing at last nights meeting, I have a revised Quote as
per below.
Can we get votes on each level perhaps. ie: if you could all reply, as
follows:
Upgrade Level E: Yes/No
Upgrade Level G: Yes/No
UPGRADE LEVEL E:
*Paint to purple Mosaic columns outside = $400
*Paint ceiling throughout Foyer = $1,150
*Demolish & remove purple fabric = $150
*Place arced framing, instead of existing angles at above wall = $1,250
*Place full height tiles to above at removed fabric (28m2*$80/m2) = $2,240
*Supply above high quality tiles (28m2*$80/m2) = $2,240
TOTAL LEVEL E UPGRADE = $7,430+GST = $8,173
*No allowance to replace light fittings
UPGRADE LEVEL G:
*Demolish and remove existing floor finishes = $1,900
*Install new floor finishes (25m2*$80/m2) = $2,000
*Supply above high quality finishes (25m2*$80/m2) = $2,000
*Remove colonial skirtings & Architraves, and square-set wall finishes =
$800
*Repaint all of Foyer = $1,800
*Less Insurance rebate (-$2,400)
TOTAL LEVEL E UPGRADE = $6,100+GST = $6,710
*Total for both Lobby areas = $15,423
Best Regards
Shane Ellis
0423 000 221
On 19/03/2013, at 5:29 PM, Shane Ellis <shane at ellisconstructions.com.au>
wrote:
Hi All,
For discussion at Meeting, please find below indicative costs to upgrade
finishes at Lifts and at Level E+G foyers.
Costs are fully inclusive of all material supply, design fees, etc.
I believe we should be able to tap the 'Sinking Fund' for the costs. The
existing style is very dated.
UPGRADE LEVEL E:
*Paint to purple Mosaic columns outside = $400
*Paint ceiling throughout Foyer = $1,150
*Demolish & remove purple fabric = $150
*Place arced framing, instead of existing angles at above wall = $1,250
*Place full height tiles to above at removed fabric (28m2*$80/m2) = $2,240
*Supply above high quality tiles (28m2*$80/m2) = $2,240
TOTAL LEVEL E UPGRADE = $7,430+GST = $8,173
UPGRADE LEVEL G:
*Demolish and remove existing floor finishes = $1,900
*Install new floor finishes (25m2*$80/m2) = $2,000
*Supply above high quality finishes (25m2*$80/m2) = $2,000
*Remove colonial skirtings & Architraves, and square-set wall finishes =
$800
*Repaint all of Foyer = $1,800
TOTAL LEVEL E UPGRADE = $8,500+GST = $9,350
*OPTION to frame Western foyer wall, add arced frame to corner, and tile
extent of wall = $4,510 Inc Tile supply & GST.
*OPTION to tile wall opposite to lift walls = $4,400
UPGRADE ELEVATORS:
*Remove 2 downlights and plug holes = $200*2 = $400
*Rub back clear finish to timber panels = $950*2 = $1,900
*Apply new stain to timber panels = $850*2 = $1,700
TOTAL ELEVATORS UPGRADE = $4,000+GST = $4,450
*Total for all 3 areas = $21,973
*Total including Options for Level G tiled walls = $30,883
These are pricing for my company to undertake the works.
I believe that these are competitive costs, and that we will get alot of
'bang for our buck' - as we can get high quality finishes without the need
to engage an architect or designer.
re quality of work, below is a link to a recently completed project of mine.
http://www.brettboardman.com/FoxJohnstonArchitects_QueensParkHouse_WEB/
Best Regards
Shane Ellis
0423 000 221
_______________________________________________
EC mailing list
EC at 200william.com
http://200william.com/mailman/listinfo/ec
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://200william.com/mailman/private/ec/attachments/20130321/ce345849/attachment.html
More information about the EC
mailing list