<html><head><meta http-equiv="content-type" content="text/html; charset=utf-8"></head><body dir="auto"><span style="font-size:-webkit-xxx-large">🙁</span><br><br><div dir="ltr">Sent from my iPhone</div><div dir="ltr"><br><blockquote type="cite">On 11 Sep 2023, at 6:48 am, matt@perkins.id.au wrote:<br><br></blockquote></div><blockquote type="cite"><div dir="ltr">
<title></title>
<div name="messageBodySection">
<div dir="auto">Hi All,<br>
Just a heads up that the BMC has been informed that there are some mandatory upgrades that are required before the lift can be rectified which is done each year.<br>
So far, we have received a single quote of around $15k. I have asked that we get some further quotes but assuming that they will not be too much different from the incumbent, there will likely be a $15k expense in the BMC for the upgrades.<br>
I think from memory, our Strata bears 95% of the cost of the lift. So most of the cost will be with our strata.</div>
</div>
<div name="messageSignatureSection"><br>
Matt</div>
<span>-- </span><br><span>ec mailing list</span><br><span>ec@mailman.perkins.id.au</span><br><span>http://mailman.perkins.id.au/cgi-bin/mailman/listinfo/ec</span><br></div></blockquote></body></html>