[200William-EC SP67851] EXT - Outstanding Issues

Matt Perkins matt at spectrum.com.au
Wed Jan 15 00:08:19 AEDT 2020


Hi Sarkis, 
Can you please post an energy bill for the BMC im interested in the rate and plan we are on so I calculate the percentage of the bill that is the down lights on the floors 

Matt



-- 
/* Matt Perkins
       Direct 1300 137 379     Spectrum Networks Ptd. Ltd.
       Office 1300 133 299     matt at spectrum.com.au
       Fax    1300 133 255     Level 6, 350 George Street Sydney 2000
      SIP 1300137379 at sip.spectrum.com.au
       Google Talk MattAPerkins at gmail.com
       PGP/GNUPG Public Key can be found at  http://pgp.mit.edu
*/

> On 14 Jan 2020, at 11:29 am, Creighton, Adam <creightona at theaustralian.com.au> wrote:
> 
> 
> Hi everyone,
> Thanks Darren; all those issues seem in train. 
> Darren informed me that only levels 3 and 7 have sensor lights. I reckon we should get sensors urgently (except for level 6) as a way to trim $56k annual electricity bill.
> Having all those lights on all day, all night must cost a fortune. 
> Sarkis, should we do this at the same time as replacing all the globes with power saving globes?
> cheers,
> Adam 
> 
> 
>> On Mon, 13 Jan 2020 at 09:27, Marquis <Marquis at bfms.com.au> wrote:
>> Hi All,
>> 
>> Happy New Year.
>> 
>> Q. Lift Tiles ( Approved I think waiting install date)
>> A. The contractor we had arranged for the works has dragged their heels so we have two other companies providing a cost. Hope to have some numbers by the end of the week.
>> 
>> Q. Level 7 Hogged Tiles. (Solution possible strip & decking etc)
>> A. We have sent out numerous quote requests but due to the XMAS period responses have been slow. I will follow up again now most contractors are back to work.
>> 
>> Q. Level P4 Water in parking spots (Drains approved waiting install date)
>> A. Complete approval from BMC is still outstanding. When Prime Pumps attended site to replace the sewer grinder pump they found that when the pumps around the sewer pit were installed to stop the ground water leak into P4 the wiring was mixed up so the new panel was actually controlling the sewer grinder pumps instead of the ground water pumps. Turns out that the sewer pump is fine and the ground water pumps around the sewer pit had both failed. The control panels have been relabelled and both sewer ground water pumps have been replaced with better quality units. We would like to have the P4 pooling water cleaned up and monitor whether the issue remains now that the system is working as designed.
>> 
>> Front awning damage by truck. (Not sure what we are waiting on insurance ?)
>> Work order was issued to Express Glass I will follow up an install date.
>> 
>> Kind regards,
>> 
>> Darren Vignes
>> Building Manager
>> 
>> 
>> Building Facilities Management Solutions
>> 200 William St Woolloomooloo NSW 2011
>> M: 0488 388 313
>> Email: marquis at bfms.com.au
>> www.bfms.com.au <http://www.bfms.com.au/> 
>> Please consider the environment before printing this e-mail
>> The contents of this e-mail and its attachments are confidential and may be subject to legal professional privilege and copyright. It is intended solely for the addressee. Access to this e-mail and its attachment by anyone else is unauthorised. No representation is made that this e-mail or any attachment is free of viruses and other defects. Virus scanning is recommended and is the responsibility of the recipient. If you are not the intended addressee, any disclosure, usage, copying, distribution or any action taken or omitted to be taken in reliance on it, is prohibited. If you have received this communication in error, please advise the sender immediately by reply e-mail and delete this message from your computer.
>> 
>> 
>> On 6/1/20, 6:28 pm, "Matt Perkins" <matt at spectrum.com.au> wrote:
>> 
>> Hi All,
>> 
>> Happy New Year hope you had a good holiday period. Here's some 
>> outstanding things for 2020
>> 
>> Lift Tiles ( Approved I think waiting install date)
>> 
>> Level 7 Hogged Tiles. (Solution possible strip & decking etc)
>> 
>> Level P4 Water in parking spots (Drains approved waiting install date)
>> 
>> Front awning damage by truck. (Not sure what we are waiting on insurance 
>> ? )
>> 
>> Can anyone think of anything else.
>> 
>> Matt
>> 
>> 
>> 
>> -- 
>> /* Matt Perkins
>> Direct 02 8916 8101 Spectrum Networks Ptd. Ltd.
>> Office 1300 133 299 matt at spectrum.com.au
>> ABN 66 090 112 913 Level 6, 350 George Street Sydney 2000
>> */
>> 
>> 
>> 
>> 
>> _______________________________________________
>> EC mailing list
>> EC at 200william.com
>> http://200william.com/mailman/listinfo/ec
> 
> 
> -- 
> ADAM CREIGHTON
> Economics Editor
> 2 Holt Street Surry Hills NSW 2010 
> T +61 2 9288 3995 M +61 457 806 706 
> E creightona at theaustralian.com.au W theaustralian.com.au
> Subscribe to The Australian	Follow us online      
> 
> Proudly supporting 1 degree, A News Corp Australia initiative.
> 
> 
> This message and its attachments may contain legally privileged or confidential information. It is intended solely for the named addressee. If you are not the addressee indicated in this message or responsible for delivery of the message to the addressee, you may not copy or deliver this message or its attachments to anyone. Rather, you should permanently delete this message and its attachments and kindly notify the sender by reply e-mail. Any content of this message and its attachments which does not relate to the official business of the sending company must be taken not to have been sent or endorsed by that company or any of its related entities. No warranty is made that the e-mail or attachments are free from computer virus or other defect.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://200william.com/mailman/private/ec/attachments/20200115/0da3dada/attachment.html 


More information about the EC mailing list