Q. Lift Tiles ( Approved I think waiting install date)
A. The contractor we had arranged for the works has dragged their heels so we have two other companies providing a cost. Hope to have some numbers by the end of the week.
    
Q. Level 7 Hogged Tiles. (Solution possible strip & decking etc)
A. We have sent out numerous quote requests but due to the XMAS period responses have been slow. I will follow up again now most contractors are back to work.
    
Q. Level P4 Water in parking spots (Drains approved waiting install date)
A. Complete approval from BMC is still outstanding. When Prime Pumps attended site to replace the sewer grinder pump they found that when the pumps around the sewer pit were installed to stop the ground water leak into P4 the wiring was mixed up so the new panel was actually controlling the sewer grinder pumps instead of the ground water pumps. Turns out that the sewer pump is fine and the ground water pumps around the sewer pit had both failed. The control panels have been relabelled and both sewer ground water pumps have been replaced with better quality units. We would like to have the P4 pooling water cleaned up and monitor whether the issue remains now that the system is working as designed.
    
Front awning damage by truck. (Not sure what we are waiting on insurance ?)
Work order was issued to Express Glass I will follow up an install date.

Kind regards,

Darren Vignes
Building Manager


Building Facilities Management Solutions
200 William St Woolloomooloo NSW 2011
M: 0488 388 313
Email: marquis at bfms.com.au
www.bfms.com.au <http://www.bfms.com.au/> 
 Please consider the environment before printing this e-mail
The contents of this e-mail and its attachments are confidential and may be subject to legal professional privilege and copyright. It is intended solely for the addressee. Access to this e-mail and its attachment by anyone else is unauthorised. No representation is made that this e-mail or any attachment is free of viruses and other defects. Virus scanning is recommended and is the responsibility of the recipient. If you are not the intended addressee, any disclosure, usage, copying, distribution or any action taken or omitted to be taken in reliance on it, is prohibited. If you have received this communication in error, please advise the sender immediately by reply e-mail and delete this message from your computer.
 

On 6/1/20, 6:28 pm, "Matt Perkins" <matt at spectrum.com.au> wrote:

    Hi All,
    
      Happy New Year hope you had a good holiday period.  Here's some 
    outstanding things for 2020
    
    Lift Tiles ( Approved I think waiting install date)
    
    Level 7 Hogged Tiles. (Solution possible strip & decking etc)
    
    Level P4 Water in parking spots (Drains approved waiting install date)
    
    Front awning damage by truck. (Not sure what we are waiting on insurance 
    ? )
    
    Can anyone think of anything else.
    
    Matt
    
    
    
    -- 
    /* Matt Perkins
             Direct 02 8916 8101     Spectrum Networks Ptd. Ltd.
             Office 1300 133 299     matt at spectrum.com.au
             ABN 66 090 112 913      Level 6, 350 George Street Sydney 2000
    */
    
    




More information about the EC mailing list