[200William-EC SP67851] SP 67851 - Finances for Western Rooftop Terrace Tile Repairs
Matt Perkins
matt at spectrum.com.au
Tue May 14 17:19:00 AEST 2019
Thanks for the update Patrick.
Matt
--
/* Matt Perkins
Direct 1300 137 379 Spectrum Networks Ptd. Ltd.
Office 1300 133 299 matt at spectrum.com.au
Fax 1300 133 255 Level 6, 350 George Street Sydney 2000
SIP 1300137379 at sip.spectrum.com.au
Google Talk MattAPerkins at gmail.com
PGP/GNUPG Public Key can be found at http://pgp.mit.edu
*/
> On 14 May 2019, at 5:17 pm, Patrick Rush <prush at stratatitle.com.au> wrote:
>
> Hi Matt,
>
> There is just over $120,000.00 cash at bank as of today in the Capital Works Fund.
>
>
>
> Kind regards,
>
> Patrick Rush
> Regional Manager
>
> <image005.png>
>
> t. (02) 9266 2600
> d. (02) 9266 2695
> e. prush at stratatitle.com.au
> a. Shop 6/78-80 Alexander Street, CROWS NEST, NSW 2065
>
>
> <image006.jpg>
> DISCLAIMER: Strata Title Management takes no responsibility for content included in this email when relating to a client matter. Please view Smarter Communities’ full email communication disclaimer smartercommunities.com.au/disclaimer
>
> From: Matt Perkins <matt at spectrum.com.au>
> Sent: Tuesday, 14 May 2019 12:42 PM
> To: Marquis <Marquis at bfms.com.au>
> Cc: robin.j.patrick at gmail.com; brookbeves at bigpond.com; ennvvest at gmail.com; craigstephenlaforest at gmail.com; Patrick Rush <prush at stratatitle.com.au>
> Subject: Re: SP67851 Marquis Re: Western Rooftop Terrace Tile Repairs
>
> WARNING. This email was received from an external sender. You should verify the email address before processing the email.
>
> Thanks for all the clarification given that all I agree to remedial building being appointed
>
> Patrick please follow up ASAP on budget for special levy.
>
> Matt
>
>
>
> --
> /* Matt Perkins
> Direct 1300 137 379 Spectrum Networks Ptd. Ltd.
> Office 1300 133 299 matt at spectrum.com.au
> Fax 1300 133 255 Level 6, 350 George Street Sydney 2000
> SIP 1300137379 at sip.spectrum.com.au
> Google Talk MattAPerkins at gmail.com
> PGP/GNUPG Public Key can be found at http://pgp.mit.edu
> */
>
> On 14 May 2019, at 12:32 pm, Marquis <Marquis at bfms.com.au> wrote:
>
> Hi Matt,
>
> This matter is for fixing the hogged tiles above 601.
> Yes, the damage can’t be patched as per Costin Roe recommendation Options 1 or 2. Cracking of the tile bed has occurred due to water penetration causing movement of the insulation foam beneath the tile bed. Option 3 was to remove all and reinstate new including a recommendation to replace the waterproofing membrane at the same time.
>
> This is only a cost for project Management the final cost is still yet to be determined but likely to be $40 ~ 60k
> The cost is for review of the scope of works, tender management of 3 qualified contractors including Pres. Tech (to use as comparison) and contract preparation. Project management is a percentage of the total works sum. Remedial Building have included this in their proposal based on a 70K total works estimate.
>
> Would it be better for us to use Preservation Tech for the final work because of warranty reasons with the existing work?
> Definitely, if an issue arises within the warranty period it will be difficult to place the blame with two contractors having worked on the same area.
>
> Looks like cheapest quote is Remedial Building given there management fee is included.
> Agreed.
>
> Are we saying we have not been able to find an independent builder and need to use an engineering firm to manage it.
> The contractors I have approached are reluctant to take on the work due to the potential warranty issues previously discussed. Pres Tech will only consider the works if an independent consult is engaged to mediate between the two parties.
>
> Kind regards,
>
> Darren Vignes
>
> Building Manager
>
> <image001.png>
>
>
> Building Facilities Management Solutions
> 200 William St Woolloomooloo NSW 2011
>
> M: 0488 388 313
> Email: marquis at bfms.com.au
> www.bfms.com.au
>
> Please consider the environment before printing this e-mail
>
> The contents of this e-mail and its attachments are confidential and may be subject to legal professional privilege and copyright. It is intended solely for the addressee. Access to this e-mail and its attachment by anyone else is unauthorised. No representation is made that this e-mail or any attachment is free of viruses and other defects. Virus scanning is recommended and is the responsibility of the recipient. If you are not the intended addressee, any disclosure, usage, copying, distribution or any action taken or omitted to be taken in reliance on it, is prohibited. If you have received this communication in error, please advise the sender immediately by reply e-mail and delete this message from your computer.
>
>
> From: MQ 302 - Matt Perkins <matt at spectrum.com.au>
> Date: Monday, 13 May 2019 at 4:13 pm
> To: Marquis <Marquis at bfms.com.au>, MQ 102 - Robin Patrick <robin.j.patrick at gmail.com>, "MQ 402 - Brook Beves(EC)" <brookbeves at bigpond.com>, MQ 602 - Ken West <ennvvest at gmail.com>, "craigstephenlaforest at gmail.com" <craigstephenlaforest at gmail.com>, STM - Patrick Rush <prush at stratatitle.com.au>
> Subject: Re: SP67851 Marquis Re: Western Rooftop Terrace Tile Repairs
>
> This matter is for fixing the hogged tiles above 601.
> This is only a cost for project Management the final cost is still yet to be determined but likely to be $40 ~ 60k
> Would it be better for us to use Preservation Tech for the final work because of warranty reasons with the existing work?
> Looks like cheapest quote is Remedial Building given there management fee is included.
> Are we saying we have not been able to find a independent builder and need to use a engineering firm to manage it.
> _______________________________________________
> EC mailing list
> EC at 200william.com
> http://200william.com/mailman/listinfo/ec
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://200william.com/mailman/private/ec/attachments/20190514/fe6e4e8e/attachment.html
More information about the EC
mailing list