Hi all,
Sorry for the delay. Just back from Melbourne.
I have checked the roof and it seems to be draining well after the big storm overnight, so thats good news.
After new inspection the foam will be needed as they need to match both sides and the height issues are obvious.
However, they quoted for the job and should have known that the insulation was there in the first place so they should absorb that cost.
Additionally they knew this 3 months ago when they pulled up the tiles and didn’t bring it up then so not impressed.
It is crazy that no work at all is being done still with no start or end in sight.
I hope they are not being paid in advance as they seen to not care about completing this job.
In short lets get this done and finished.
Regards,
Ken and Cathy
> On 24 Oct 2017, at 4:46 PM, Robin Patrick <robin.j.patrick at gmail.com> wrote:
>
> Agreed as per Mat's email.
>
> On Tue, Oct 24, 2017 at 4:41 PM, Matt Perkins <matt at spectrum.com.au <mailto:matt at spectrum.com.au>> wrote:
> Hi Patrick/All
> That's a lot of info thanks. Here's my comments/votes on the bellow.
>
> 1. I think it would be best to make both 601 & 602 the same as they seem to be effected by the same issues. To that end I would like to at least see the quote for both.
>
> 2. Given that the BBQ area must be stay or special resolution passed. I think best to leave to we are finished and then get a quote to put some rubber seals on the doors and a lock so it can not be opened. There is nothing in that area that BBQ users need to access. I know some would like the BBQ removed. But as that is not in the EC's power lets leave that debate for the appropriate time.
>
> 3. I will leave Cathy and Ken to comment on the break down.
>
> Matt.
>
>
> On 24/10/17 4:26 pm, Patrick Rush wrote:
>> Dear Committee,
>>
>>
>>
>> I have been provided with the attached report, which includes 1 further variation for the installation of insulation above Unit 602.
>>
>>
>> I believe this variation requires approval as Unit 602 had such insulation and the Owners Corporation are required to repair and amanitin the current common property, being the insulation, with the details and the cost below –
>>
>>
>>
>> The variation cost to supply and install Kingspan XPS N 300 Insulation (50mm) to terrace area only above unit 602 would be $5200 <tel:+445200>+ GST.
>>
>>
>>
>> This was not initially included in the initial scope as we were not aware there was insulation under the tiles. Re-installing insulation above unit 602 is recommended to control the internal temperature.
>>
>>
>>
>> Since the podium and steps previously did not have any insulation we will not be placing insulation on those areas. Therefore the quote above is only for the terrace area above unit 602.
>>
>>
>>
>> Please approve the above variation so that Preservation Technologies can recommence the rectification and complete this prior to the Christmas break?
>>
>>
>>
>> Please also advise if you would like such insulation installed above unit 601 and I can obtain a quote for this variation?
>>
>>
>>
>>
>>
>> See the below comments in relation to works that will be required to seal the BBQ area, that I can request a quote from Preservation Technologies, Please advise if you would like Preservation Technologies to quote on this as well as cleaning the blocked drainage on the Terrace which is requiem or would you like Darren to organise?
>>
>>
>> The doors below the BBQ is of concern as they do not seal adequately, which could let water into the enclosed cabinets under the BBQ, photos attached. From my site inspections we do not believe this a pressing issue, as we are unsure if water enters the area under the BBQ during rain events.
>>
>>
>>
>> The SC could consider;
>>
>> Install seals around the door – Can be included as a variation by Prestech or through engagement of another contractor after the completion of this work (recommended)
>>
>> Screed area to create a fall to a drainage point and waterproof the internal of the BBQ area
>>
>>
>>
>> As previously discussed, the SC also need to consider cleaning the blocked drainage on the terrace.
>>
>>
>>
>>
>>
>> Finally, please see the breakdown of cost and materials for the waterproofing of the terraces above both Unit 601 & 5602 that was requested at the AGM for your information. No action on this matter is required!
>>
>>
>>
>>
>> <image010.png>Breakdown of which is as follows;
>>
>>
>>
>> <image011.png>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>> Kind regards,
>>
>> Patrick Rush
>>
>> Senior Community Manager
>>
>>
>>
>> Phone: (02) 9266 2600 | DirectPhone: (02) 9266 2695 | Email: prush at stratatitle.com.au <mailto:northshore at stratatitle.com.au> | Address: PO Box 2727, Taren Point, NSW 2229
>>
>>
>>
>> <image001.jpg> <image002.png> <http://www.facebook.com/StrataTitleManagement> <image003.png> <http://www.linkedin.com/company/strata-title-management-stm> <image004.png> <http://www.twitter.com/STMStrata> <image005.png> <http://www.pinterest.com/STMStrata> <image006.png> <http://plus.google.com/+StrataTitleManagemenSydney>
>>
>>
>> Emailed Communication / Documents Disclaimer
>>
>> STM Limited takes no responsibility for content included in this email when relating to a client matter.
>>
>> Please view Vesture’s full email communication disclaimer on our website –www.stratatitle.com.au/disclaimer/ <http://www.stratatitle.com.au/disclaimer/>
>> Important Notice: Owners should be aware that all correspondence, including letters, facsimile transmissions and emails are retained on the file of your scheme and may be subject to inspection by owners and residents within your scheme, as well as prospective purchasers for any lot that may be for sale within your scheme. As such author discretion is advised.
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>> _______________________________________________
>> EC mailing list
>> EC at 200william.com <mailto:EC at 200william.com>
>> http://200william.com/mailman/listinfo/ec <http://200william.com/mailman/listinfo/ec>
>
> --
> /* Matt Perkins
> Direct 1300 137 379 Spectrum Networks Ptd. Ltd.
> Office 1300 133 299 matt at spectrum.com.au <mailto:matt at spectrum.com.au>
> Level 6, 350 George Street Sydney 2000
> Spectrum Networks is a member of the Communications Alliance & TIO
> */
>
> _______________________________________________
> EC mailing list
> EC at 200william.com <mailto:EC at 200william.com>
> http://200william.com/mailman/listinfo/ec <http://200william.com/mailman/listinfo/ec>
>
>
> _______________________________________________
> EC mailing list
> EC at 200william.com
> http://200william.com/mailman/listinfo/ec
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://200william.com/mailman/private/ec/attachments/20171027/8eead52a/attachment-0001.html
More information about the EC
mailing list