Hi Matt & Fellow Committee Members,
Basement Level 4 is in fact the Owners SP 67851’s property with easements as per the attached strata plan that allow SP 67850 to use parts of the areas. There are no exclusive use By Laws.
Depending on what the easements say and where the fuel tank is located will determine who is responsible for the repairs and maintenance.
It will not likely be the BMC but either the commercial or residential strata that are required to undertake the repairs.
Darren, can you please mark on the attached strata plan exactly where the fuel tank is located and I can then review along with the easement and advise who is responsible for the repair s and maintenance of the leaking water if in fact this is coming from the fuel tank. Can you also confirm if water is leaking from this fuel tank and causing the pooling water in Basement Level 4?
Kind regards,
Patrick Rush
Strata Manager
Phone: (02) 9266 2600 | Email: prush at stratatitle.com.au<mailto:northshore at stratatitle.com.au> | Address: PO Box 2727, Taren Point, NSW 2229
[cid:BEA4112D-982D-40A7-9E7A-95F7B76E7ACE at fritz.box]<http://www.stratatitle.com.au/> [cid:C9038DE0-22F0-48A5-82C9-2AAA48233316 at fritz.box] <http://www.facebook.com/StrataTitleManagement> [cid:E179D377-28C0-4C30-A8C6-AEA7CFCA04E5 at fritz.box] <http://www.linkedin.com/company/strata-title-management-stm> [cid:1950DB4B-6066-468B-8AD1-875EFBC4D48C at fritz.box] <http://www.twitter.com/STMStrata> [pinterest.png] <http://www.pinterest.com/STMStrata> [google_plus.png] <http://plus.google.com/+StrataTitleManagemenSydney>
Emailed Communication / Documents Disclaimer
STM Limited takes no responsibility for content included in this email when relating to a client matter.
Please view Vesture’s full email communication disclaimer on our website – www.stratatitle.com.au/disclaimer/<http://www.stratatitle.com.au/disclaimer/>
Important Notice: Owners should be aware that all correspondence, including letters, facsimile transmissions and emails are retained on the file of your scheme and may be subject to inspection by owners and residents within your scheme, as well as prospective purchasers for any lot that may be for sale within your scheme. As such author discretion is advised.
From: ec-bounces at 200william.com [mailto:ec-bounces at 200william.com] On Behalf Of Matt Perkins
Sent: Friday, 1 July 2016 6:17 PM
To: Ed Sainsbury
Cc: ec at 200william.com; Marquis BFMS
Subject: Re: [200William-EC SP67851] SP 67851 - Engineers Report for Water Issues for Unit 601 & 602
Sorry for my short reply before I was out and about and didn't want to see someone exposing a 10,000l fuel tank with a metal crowbar.
The matter with the water in the carpark has been determined by Darren and the contractors to be water from the wet wall Seeping along under where the ramp was poured over the slab. In essence it's bad building design.
Two solutions have been offered. Cutting a drain and / or cleaning the wet wall Pitts and walls in that area so water can more easily drain to the sump.
The strata manager has determined that level p4 is residential strata as there are no commercial lots there. However as Avis maintain an exclusive use bylaw for the fuel tank which is part of the commercial strata. Not only is the tank located on level p4 but it's design is partly responsible for the water under the ramp. Therefor I believe the strata manager is in error.
I believe the water in the car park is a bmc issue and the solution should be to cut in a drain to the sump. An expense which should be born by the bmc.
I will ask the strata manager to put the question to the bmc. I'm sure Andrews response will be to deny the request.
Where we go from there is uncertain. We could pay for it ourselves with a special levy or we could perhaps find a way to compel the bmc to fix the issue.
Darren is obtaining quotes for the fix.
--
/* Matt Perkins
Direct 1300 137 379 Spectrum Networks Ptd. Ltd.
Office 1300 133 299 matt at spectrum.com.au<mailto:matt at spectrum.com.au>
Fax 1300 133 255 Level 6, 350 George Street Sydney 2000
SIP 1300137379 at sip.spectrum.com.au<mailto:1300137379 at sip.spectrum.com.au>
Google Talk MattAPerkins at gmail.com<mailto:MattAPerkins at gmail.com>
PGP/GNUPG Public Key can be found at http://pgp.mit.edu
*/
On 1 Jul 2016, at 4:50 PM, Ed Sainsbury <edsainsbury at ozemail.com.au<mailto:edsainsbury at ozemail.com.au>> wrote:
Dear EC,
I went up to Craig's apartment to have him show me the water issues, so I could better understand them. I can confirm that there is still water coming down behind the exterior paint from the roof area on the western and north-western sides. It is creating pockets of pooled water under the exterior paint.
I was also shown the water polling in the basement. I am thinking that it might be coming from pumps or other, that are under the plates on the ramp down to P4. I was wondering if anyone k owe whether the strata has steel rods (like a crow bar) that are used to lift the concrete plates, so that we could look in to see if they are leaking.
<image1.JPG>
<image2.JPG>
Regards,
Edward
Sent from my iPhone
On 1 Jul 2016, at 12:51 PM, Robin Patrick <robin.j.patrick at gmail.com<mailto:robin.j.patrick at gmail.com>> wrote:
I agree to proceed with the recommendations.
Thanks
RJP
On Wed, Jun 29, 2016 at 5:05 PM, Patrick Rush <prush at stratatitle.com.au<mailto:prush at stratatitle.com.au>> wrote:
Dear Committee,
Please see attached a copy of the report from Strata Engineering Solutions.
Please review and if you agree with the recommendations on Page 2 & 3 I will request the Engineer to proceed?
If agreed, I believe it may also be best to have Strata Engineering Solutions attend and inspect the pooling issue in the basement car park currently being experienced.
Both these items will be at a charge, while the attached report was carried out at no charge.
Please advise on Teh above?
Kind regards,
Patrick Rush
Strata Manager
Phone: (02) 9266 2600 | Email: prush at stratatitle.com.au<mailto:northshore at stratatitle.com.au> | Address: PO Box 2727, Taren Point, NSW 2229
<image001.png><http://www.stratatitle.com.au/> <image002.png><http://www.facebook.com/StrataTitleManagement> <image003.png> <http://www.linkedin.com/company/strata-title-management-stm> <image004.png><http://www.twitter.com/STMStrata> <image006.png><http://www.pinterest.com/STMStrata> <image008.png><http://plus.google.com/+StrataTitleManagemenSydney>
Emailed Communication / Documents Disclaimer
STM Limited takes no responsibility for content included in this email when relating to a client matter.
Please view Vesture’s full email communication disclaimer on our website – www.stratatitle.com.au/disclaimer/<http://www.stratatitle.com.au/disclaimer/>
Important Notice: Owners should be aware that all correspondence, including letters, facsimile transmissions and emails are retained on the file of your scheme and may be subject to inspection by owners and residents within your scheme, as well as prospective purchasers for any lot that may be for sale within your scheme. As such author discretion is advised.
_______________________________________________
EC mailing list
EC at 200william.com<mailto:EC at 200william.com>
http://200william.com/mailman/listinfo/ec
_______________________________________________
EC mailing list
EC at 200william.com<mailto:EC at 200william.com>
http://200william.com/mailman/listinfo/ec
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://200william.com/mailman/private/ec/attachments/20160704/afabb9ee/attachment-0001.html
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.png
Type: image/png
Size: 17026 bytes
Desc: image001.png
Url : http://200william.com/mailman/private/ec/attachments/20160704/afabb9ee/attachment-0006.png
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.png
Type: image/png
Size: 4236 bytes
Desc: image002.png
Url : http://200william.com/mailman/private/ec/attachments/20160704/afabb9ee/attachment-0007.png
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image003.png
Type: image/png
Size: 3977 bytes
Desc: image003.png
Url : http://200william.com/mailman/private/ec/attachments/20160704/afabb9ee/attachment-0008.png
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image004.png
Type: image/png
Size: 4502 bytes
Desc: image004.png
Url : http://200william.com/mailman/private/ec/attachments/20160704/afabb9ee/attachment-0009.png
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image006.png
Type: image/png
Size: 1493 bytes
Desc: image006.png
Url : http://200william.com/mailman/private/ec/attachments/20160704/afabb9ee/attachment-0010.png
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image008.png
Type: image/png
Size: 1724 bytes
Desc: image008.png
Url : http://200william.com/mailman/private/ec/attachments/20160704/afabb9ee/attachment-0011.png
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Carspaces Unit Allocation.pdf
Type: application/pdf
Size: 429406 bytes
Desc: Carspaces Unit Allocation.pdf
Url : http://200william.com/mailman/private/ec/attachments/20160704/afabb9ee/attachment-0001.pdf
More information about the EC
mailing list